My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOLLY
>
3900
>
3500 - Local Oversight Program
>
PR0544990
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 2:04:07 PM
Creation date
11/15/2019 1:49:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544990
PE
3528
FACILITY_ID
FA0006902
FACILITY_NAME
TRACY WASTEWATER TX PLNT
STREET_NUMBER
3900
STREET_NAME
HOLLY
STREET_TYPE
DR
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
3900 HOLLY DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALT"EPARTMENT <br /> PQU'" SAN JOAQUIN COUNTY <br /> �o_ate.co <br /> Unit Supervisors <br /> Donna K.Heran,R.E.H.S. Carl Bor an,R.E.H.S. <br /> Director 304 East Weber Avenue, Third Floor Mike Huggins, R.D.I. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> Program Manager Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> �"6 Laurie A.Cotulla,R.E.H <br /> Pro ram Mana er E C E 2�) 0138 Robert McClellon,R.E.H.S. <br /> . <br /> g g D Mark Barcellos,R.E.H.S. <br /> PAUL VERMA MAR 1 8 2002 Lj MAR 13 2002 <br /> CITY OF TRACY <br /> 520 TRACY BLVD CITY OF TRACY <br /> TRACY CA 95376 D.E.S. <br /> RE: Cage-N-Play Delta Disposal Wastewater Treatment Plant <br /> 68 E. Eleventh St. 99 W. Sixth St. 3900 Holly Drive <br /> Tracy CA 95376 Tracy CA 95370 Tracy CA 95376 <br /> The above referenced sites are leaking underground storage tanks sites that have been <br /> assigned to the San Joaquin County Environmental Health Departments (SJC/EHD) Local <br /> Oversight Program. The City of Tracy Public Works Department is the listed Responsible <br /> Party to all three sites, and was given specific directives regarding the site investigations <br /> required at each site in separate correspondences dated August 15, 2001. <br /> Due to the City of Tracy's lack of response to the directives, SJC/EHD has established the <br /> following schedule for completion of the respective.site investigations. <br /> 1. Cage-N-Play, 68 E. Eleventh St.- <br /> This <br /> t.This site in on the State Water Resources Control Board (SWRCB) list of sites <br /> that have not completed testing for methyl tertiary butyl ether(MtBE). This fact <br /> makes this a priority site. A work plan to begin the site investigation was <br /> approved by SJC/EHD on September 25, 1997, and a Letter of Commitment for <br /> funding was received from the SWRCB Cleanup Fund on April 27, 1998. The <br /> deadline for implementation of this work plan is May 3, 2002. A report of findings <br /> documenting the investigation is due for submittal within 60-days following com- <br /> pletion of the fieldwork. <br /> 2. Delta Disposal, 99 W. Sixth St. <br /> This site also has not had analytical results from MtBE testing submitted to the <br /> SWRCB and therefore is a priority site. A work plan to begin the site investi- <br /> gation was conditionally approved by SJC/EHD on May 6, 1998. The deadline <br /> for implementation of this work plan is May 10, 2002. A report of findings <br /> documenting the investigation is due for submittal within 60-days following com- <br /> pletion of the fieldwork. <br /> 3. Wastewater Treatment Plant, 3900 Holly Drive. <br /> This site had one diesel fuel tank only and therefore does not require testing for <br /> MtBE. A work plan to begin the site investigation was approved by SJC/EHD on <br /> October 5, 2001 and was conditioned for implementation by Septenrber 5, 2001. <br /> The new deadline for implementation of the approved work plan is June 14, <br /> 2002. A report of findings documenting the investigation is due for submittal <br /> within 60 days following completion of the fieldwork. <br />
The URL can be used to link to this page
Your browser does not support the video tag.