Laserfiche WebLink
7/19/19, 8:38 AM 1 of 5 <br />Zimbra <br /> maguirre@sjgov.org <br />RE: Airpark 599 Phase I Qantas Lane - PA-1900126 <br />From : Parviz Chitsazan <Parviz.Chitsazan@stocktonca.gov> <br />Subject : RE: Airpark 599 Phase I Qantas Lane - PA-1900126 <br />To : Megan Aguirre <meaguirre@sjgov.org> <br />Cc : Willie Wong <VVillie.Wong@stocktonca.gov>, Eric Alvarez <br /><Eric.Alvarez@stocktonca.gov>, Michael McDowell <br /><Michael.McDowell@stocktonca.gov> <br />Wed, Jul 17, 2019 08:47 AM <br />04 attachments <br />Megan; The Public Works Department staff offer the following comments for your <br />consideration. <br />The County/developer/owner needs to submit an improvement Plan Application to the <br />City. <br />Dedicate, improve the Arch-Airport Road right-of-way in conformance with the City of <br />Stockton Standard and Specifications and the adopted Precise Road Plan plus additional <br />widenings such as right turn lanes and dual left turn lanes as required by the Specific <br />Land Use Plan EIR and identified in the EIR's mitigation measures. The improvements <br />shall include but not limited to; <br />signalization of intersection of Pock Lane/Arch-Airport Road, <br />signalization of intersection of Giannecchini Lane/Arch Airport Road with provisions <br />to allow the 4-leg on south side, <br />modifying the traffic signal at Qantas Lane/Arch-Airport Road, <br />Construct a center median on Arch-Airport Road between Pock Lane and Qantas <br />Lane, and <br />Install frontage improvements, on south side of Arch-Airport Road, between Pock <br />Lane and Qantas Lane <br />All roadways leading to and from the site, accesses, and on-site improvements shall <br />allow provisions for large STAA trucks (67' radius) and meet large STAA trucks <br />requirements. <br />Arch-Airport Road/SR99 interchange -Phase 2 — As part of phase 2, two flyover ramps <br />will be built. The ramps will intersect Qantas Lane west of the interchange. The Airpark <br />599 development needs to make provisions for construction of the future phase 2 <br />interchange improvements, when conditions warrant it. <br />Require a City/County cost share Agreement for operating and maintaining the traffic <br />signals at Pock Lane and Giannechini Lane. <br />Thanks,