Laserfiche WebLink
TABLE 7: <br /> Contaminant Mass Estimates-2004 <br /> Speedy Foods <br /> 8200 N. Hwy 99 <br /> Stockton,California <br /> Mass in soil <br /> Based on Concentrations from drilling investigations1999 to 2004 <br /> mass = (Volume of impacted zone)(soil density)(Average Concentration)(E-6); <br /> Volume in cu.ft.; thickness of impacted zone is 7 ft. 5-12 ft. deep) <br /> Soil density assumed 45.5 kg/cu. ft. (100lb/cu.ft.); <br /> Area (sq.ft.) Height Volume (cu.ft.) Average Mass of Mass of <br /> Contaminant (Pi x r, x rz� (feet) (pi x r, x r2 x h) Concentration Contaminant ' Contaminant <br /> -- �- (m9/k9) - --(kg) _(Ibs) <br /> TPHG 10+ ppm A 2827 15 42411 30 57.9 127.4 <br /> TPHG 10+ oom B 2827 15 42411 20 _ 38.6 84.9 <br /> TPHG 1-10 ppm 11310 50 565486 5.5 141.5 311.3 <br /> Total estimated mass of TPHG in Soil = 238.0 523.6 <br /> MTBE 10+ppm 154 10 1539 11 0.8 1.7 <br /> TBE 1-10 ppm A 1 2827 28 79168 5.5 19.8 43.6 <br /> MTBE 1-10 ppm B 707 10 7069 5.5 1.8 3.9 <br /> MTBE 0.1-1 ppm A 5027 55 276460 0.55 6.9 15.2 <br /> BE 0.1-1 ppm B 908 12 10895 0.55 0.27 0.60 <br /> VTBE_0.01-0.1 ppm A 5542 55 304797 0.0551. 0.763 1.678 <br /> TBE 0.01-0.1 ppm B 1257 15 18850 0.055 0.0471 0.104 <br /> otal estimated mass of MTBE in Soil = 30.4T- 66.81 <br /> Gross estimation in soil <br /> avg MTBE in MW1, VW1, SB1-SB3 is 1.5 ppm <br /> area of impact is radius of 40 feet or about 5026 sq ft <br /> impacted from below tank pit to groundwater(15-70 feet), or 55 feet <br /> volume is 276460 cu ft, with density of 100 Ib/cu ft <br /> mass is 41 Ib MTBE <br /> avg TPHg in soil over same area is 18.5 ppm <br /> mass is 511 Ib <br /> Free Product: <br /> Prior to pumping, average thickness of 0.29-foot of free product with an estimated radius of 10 feet, <br /> 30% porosity, density of gasoline 0.80, 15%of gasoline comprised of MTBE <br /> Estimated 205 gallons of free product, or 1365 pounds of gasoline and 205 pounds of MTBE in the free product. <br /> Note that an estimated 180 gallons of product/water mix removed through passive skimmer and bailing before pump <br /> and treat began; Estimated 10-20 gallons of product removed during initial days of pump and treat. <br /> tuleburgeontmass.xls Page 1 of 2 <br />