Laserfiche WebLink
SITE HEALTH AND SAFETY PLAN <br /> PART I PART II <br /> GENERAL SITE INFORMATION EVALUATION OF POTENTIAL HAZARDS <br /> 1. Site Name:Tune Up Shop&Service Center hic 1. Chemicals Hazards <br /> Address: 1 W.Lodi Ave.Lodi CA 95242 <br /> ®Carcinogens:oil,coolant,automatic transmission fluid, <br /> Contact Person:Brian Hayn Phone No:209 334-2654 ❑Corrosives: <br /> Sweeps Number: ®Dusts: <br /> Proposed Date of investigation/inspection: ❑Explosives: <br /> ®Flammables:oil <br /> 2. Description and brief narrative of inspection activity: <br /> ❑Inorganic Gases: <br /> ❑New UST installation. ❑UAR Investigation. ❑Metals: <br /> ❑Tank Closure in Place. ❑Tank/Pipe Repair. ❑Oxidizers: <br /> ❑Tank/Pipe Removal. ❑Re-excavation. ❑PCB's: <br /> ❑Installation of Borings/Monitoring Wells. <br /> ®HW inspection <br /> 3. Specific Site Information: PART III <br /> Tank No.: Tank Capacity: REQUIRED PERSONAL PROTECTIVE EQUIPMENT <br /> Tank Content: Tank Age: 1. Monitoring Equipment(note:Monitoring instruments must be used for all <br /> Other: operations unless appropriate rationale or restrictions are provided) <br /> ❑Combustible Gas/Oxygen Meter. <br /> 4. Type of Operation:oil lube&tune un 'Sa`• ❑Detector Tubes(Specify). <br /> ❑Photo ionization Detector. <br /> 5. Release History: ❑Organic Vapor Analyzer. <br /> Evidence of leaks/soil contamination: F1 YES F1NO El Other,specify. <br /> Documented Groundwater contamination: <br /> ❑YES ❑NO If monitoring instruments are not used,rationale or activity/area restrictions: <br /> Background and description of any previous investigation or incidence: <br /> 2. Personal Protective Equipment <br /> 6. Potential Health and Safety Level of Protection: ❑A [I B ❑C OD <br /> Physical Concerns:(check all that apply&describe) ®Hard Hat. <br /> E]Heat or Cold Stress: OF(high ambient temp.) ®Safety Glasses/goggles. <br /> ®Noise Sources:traffic ®Steel toed/shank shoes or boots. <br /> ❑Oxygen Deficiency: ❑Flame retardant coveralls. <br /> ❑Excavation:(falls,trips,slipping,cave-ins): ® Hearing protection. <br /> C1Handling and Transfer of a Hazardous Substance:(fire,explosions, C1 Tyvek. <br /> etc..): ❑Respirator: ❑APR ❑SCBA <br /> ❑Confined space entry:(explosions): A/P cartridge: <br /> ❑Heavy equipment(physical injury&trauma resulting from moving ®Safety vest. <br /> equipment): ❑Two-way communication. <br /> ❑Other,specify <br /> PART IV-PLAN APPROVAL <br /> 7. Anticipated Biological Hazards: <br /> ❑Snakes ® Insects ❑Rodents ❑Poisonous Plants Plan Prepared by:Aris Cacapit Date:January 20.2010 <br /> ❑Other/Unknown(specify): <br /> Plan Approved by: `JVI V Date: � <br /> 8. Narrative(provide all information which could impact Health and Safety, <br /> e.g.,power lines,integrity of dikes,terrain,etc.) <br /> EH 23081(12/17/2002) <br />