My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012613
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2600 - Land Use Program
>
PA-1900025
>
SU0012613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2021 11:05:27 AM
Creation date
11/19/2019 8:16:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012613
PE
2631
FACILITY_NAME
PA-1900025
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-
APN
19327020
ENTERED_DATE
10/18/2019 12:00:00 AM
SITE_LOCATION
10500 S HARLAN RD
RECEIVED_DATE
10/18/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br /> Community Development Department <br /> PA-1900025 (SA) <br /> 4. The Regional Transportation Impact Fee shall be required for this application.The fee is due and <br /> payable at the time of building permit application.The fee will be based on the current schedule at <br /> the time of payment. (Resolution R-06-38) j <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> i <br /> 6. The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards.Retention basins shall be fenced with six(6)foot high chain link fence or <br /> equal when the maximum design depth is 18 inches or more.Required retention basin capacity <br /> shall be calculated and submitted along with a drainage plan for review and approval,prior to <br /> release of building permit. (Development Title Section 9-1135) <br /> i <br /> 7. This project falls within the definition of a Regulated Project as defined in either the County Post- <br /> Construction Standards Manual or the County Phase II National Pollutant Discharge Elimination <br /> System(NPDES)permit and shall comply with the following conditions: <br /> a. A registered professional engineer shall design a system or combination of systems to <br /> infiltrate,treat,and/or filter the 851 percentile storm drainage as defined in the 2015 <br /> "Multi-Agency Post-Construction Stormwater Standards Manual"or in the"California <br /> Association of Storm Water Quality Agencies"(CASQA)publications and comply with <br /> the conditions of the County Phase II National Pollutant Discharge Elimination System <br /> (NPDES)permit. Standard"Best Management Practices"for the type of development <br /> proposed shall be incorporated in the system design. CASQA documents are available at <br /> http//www.casga.org.Plans and/or calculations of the proposed system shall be submitted <br /> to the County for review and approval. <br /> b. Applicant shall submit a"Storm Water Pollution Prevention Plan"(SWPPP)to Public <br /> Works for review.A SWPPP preparation guide is available at the Department of Public <br /> Works.A copy of the approved SWPPP and all required records,updates,test results,and <br /> inspection reports shall be maintained on the construction site and be available for review <br /> upon request.The post construction chapter of the SWPPP must identify expected <br /> pollutants and how they will be prevented from entering the storm system.The chapter <br /> shall also contain a maintenance plan,a spill plan,and a training plan for all employees on <br /> proper use,handling and disposal of potential pollutants. <br /> c. Permit Registration Documents(PRD's)shall be filed with the State Water Resources <br /> Control Board(SWRCB)to comply with the State"General Permit for Storm Water <br /> Discharges Associated with Construction Activity". The Waste Discharge Identification <br /> (WDID)Number issued by SWRCB shall be submitted to the Department of Public <br /> Works for the file. Contact SWRCB at(916)341-5537 for further information. Coverage <br /> under the SWRCB General Construction Permit Order 2009-0009-DWQ shall be <br /> maintained throughout the duration of all phases of the project. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.