Laserfiche WebLink
4. A complete review, at building permit submittal, will require compliance with applicable codes <br /> and ordinances. <br /> 5. CFC, Section 105 Permits: Operational Permit(s) may be required prior to occupancy. <br /> 6. CFC, Section 510 Emergency Responder Radio Coverage-New buildings shall have approved <br /> radio coverage for emergency responders within the building based on the existing coverage <br /> levels of the public safety communication systems utilized by the Jurisdiction. <br /> 2. DEPARTMENT OF PUBLIC WORKS (Contact: [209]468-3000) <br /> a. An encroachment permit shall be required for all work within road right-of-way. (Note: Driveway <br /> encroachment permits are for flatwork only—all vertical features, including but not limited to fences, <br /> walls, private light standards, rocks, landscaping and cobbles are not allowed in the right-of-way.) <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> b. Prior to issuance of the occupancy permit,the driveway approaches on Ham Lane, Eight Mile Road <br /> and West Lane shall be improved in accordance with the requirements of San Joaquin County <br /> Improvement Standards Drawing No. R-17. (Development Title Section 9-1145.5) <br /> c. The owner shall execute an Irrevocable Offer to Dedicate Road to result in a 30-foot-wide right-of- <br /> way from the centerline of Ham Lane to the property line across the parcel's frontage. (A fee based <br /> on the current fee schedule is required for processing per Development Title Table 9-240.2 in <br /> addition to a copy of the Grant Deed and a legal description of the parcel to be offered for <br /> dedication.) (Development Title Section 9-1150.5) <br /> d. The owner shall execute an Irrevocable Offer to Dedicate Road to result in a 67.5-foot-wide right- <br /> of-way from the centerline of Eight Mile Road to the property line across the parcel's frontage. (A <br /> fee based on the current fee schedule is required for processing per Development Title Table 9- <br /> 240.2 in addition to a copy of the Grant Deed and a legal description of the parcel to be offered for <br /> dedication.) (Development Title Section 9-1150.5) <br /> e. The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and payable <br /> at the time of building permit application. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolution R-00-433) <br /> f. The Regional Transportation Impact Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current schedule at <br /> the time of payment. (Resolution R-06-38) <br /> g. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee <br /> is due and payable prior to issuance of the building permit. The fee will be based on the current <br /> schedule at the time of payment. (Development Title Section 9-818.4 and Resolutions R-91-327, <br /> R-94-185 and R-97-5) <br /> h. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> i. The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six (6)foot high chain link fence or <br /> equal when the maximum design depth is 18 inches or more. Required retention basin capacity <br /> shall be calculated and submitted along with a drainage plan for review and approval, prior to <br /> release of building permit. (Development Title Section 9-1135) <br /> j. Access to Eight Mile Road shall be in accordance with the Eight Mile Road Specific Road Plan. <br /> PA-1900240, PA-2000014, & PA-2000019—Conditions of Approval 4 <br />