My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0080576 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DAVIS
>
11763
>
2600 - Land Use Program
>
SR0080576 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2019 8:53:00 AM
Creation date
11/19/2019 8:21:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0080576
PE
2602
FACILITY_NAME
THE BRIDGE WORSHIP CENTER
STREET_NUMBER
11763
Direction
N
STREET_NAME
DAVIS
STREET_TYPE
RD
City
LODI
Zip
95242
ENTERED_DATE
5/6/2019 12:00:00 AM
SITE_LOCATION
11763 N DAVIS RD
P_LOCATION
02
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> SOILSUITABILITY STUDY.............................................................................................1 <br /> Introduction.................................................................................................................1 <br /> Proposed Development..............................................................................................1 <br /> SiteDescription...........................................................................................................2 <br /> ExistingSeptic System...................................................................................2 <br /> Proposed Septic System................................................................................2 <br /> On-Site Septic Permit History.........................................................................2 <br /> Existing Septic Tank Usage in the Vicinity.....................................................3 <br /> Septic Permit History in the Vicinity................................................................3 <br /> Ground Water Information.........................................................................................3 <br /> Depthand Gradient........................................................................................3 <br /> Potential Ground Water Contamination Issues..............................................4 <br /> On-Site Wells..................................................................................................4 <br /> WaterSample.................................................................................................4 <br /> Soil Profile and Geologic Information.......................................................................5 <br /> SoilBorings....................................................................................................6 <br /> Discussion of Soil Lithology............................................................................6 <br /> PercolationTest..........................................................................................................6 <br /> Preparation and Presaturation of Percolation Test Holes..............................7 <br /> Percolation Test Procedure............................................................................7 <br /> Percolation Test Results ................................................................................7 <br /> Discussion of Percolation Test Results..........................................................8 <br /> Discussion of Septic System Sizing...............................................................8 <br /> NITRATELOADING STUDY...........................................................................................9 <br /> Mass Transport Soil Properties.................................................................................9 <br /> Sourcesof Nitrate.....................................................................................................10 <br /> Percolating Recharge Waters..................................................................................10 <br /> Quantity and Quality of Domestic Wastewater......................................................11 <br /> Denitrification Reductions.......................................................................................13 <br /> Nitrate Loading Estimate..........................................................................................13 <br /> Discussion of Nitrate Loading Results...................................................................14 <br /> Total Nitrate Impact...................................................................................... 14 <br /> CONCLUSIONS AND RECOMMENDATIONS..............................................................15 <br /> LIMITATIONS.................................................................................................................16 <br /> SELECTED REFERENCES...........................................................................................17 <br /> LOGE 1917 <br />
The URL can be used to link to this page
Your browser does not support the video tag.