Laserfiche WebLink
Analysis <br />Background <br />On October 3, 2013, the Planning Commission approved Use Permit application No. PA-1300124 to <br />establish a crane rental facility, which included the construction of a 15,000 square foot repair shop, for <br />incidental repair of cranes, and a 3,200 square foot office building. Improvements were constructed and the <br />use was established. <br />On November 3, 2016, the Planning Commission approved Use Permit application No. PA-1600198 to <br />expand the existing crane rental facility, including the construction of an 8,960 square foot equipment <br />storage building. <br />On February 19, 2019, the applicant applied for Use Permit application No. PA-1900030 to further expand <br />the crane rental facility, which includes the construction of a 14,400 square foot equipment storage building <br />with an 8,000 square foot overhang. <br />Facility Operations <br />The existing facility operates Monday through Saturday, 6:00 a.m. to 6:00 p.m. with a maximum of thirty- <br />five (35) employees and approximately three (3) customers per day. No increase in hours, employees, or <br />customers is proposed with this expansion. <br />CSA 30 <br />The project site is located within County Service Area 30 (CSA 30 Manteca Industrial Area) for water <br />services. As a Condition of Approval for the previously approved Use Permit application No. PA-1300124, <br />the project area was required to annex into the district. As a result, an 8.42-acre northern portion of the <br />property was annexed into CSA 30. The proposed equipment storage building is located within the annexed <br />area, and will be served by CSA 30. <br />Parking Modification <br />Use Permit Application No. PA-1300124 required forty-one (41) parking stalls, and Use Permit Application <br />No. PA-1600198 required an additional two (2) parking stalls, in addition to the existing forty-one (41) <br />parking stalls, resulting in forty-three (43) existing required parking stalls. The Use Type Equipment Sales <br />& Repair— Heavy Equipment Sales, requires one (1) parking space for every 1,000 square feet of building, <br />and .67 per employee. As a result, fifteen (15) additional parking spaces would be required for this <br />expansion. However, the applicant submitted a letter dated March 5, 2019, requesting a modification in the <br />number of parking spaces required. The letter states that the proposed expansion to the existing crane <br />rental facility consists of storage area only, and the number of employees and anticipated customers will <br />not increase. The applicant has requested that there be no additional parking spaces required with this <br />project. The Community Development Department has reviewed the request and is recommending the <br />Planning Commission approve the modification. <br />San Joaquin Council of Governments <br />San Joaquin County is a signatory to San Joaquin Multi-Species Habitat Conservation and Open Space <br />Plan (SJMSCP), and this project is subject to the plan. Participation in the SJMSCP satisfies requirements <br />of both the state and federal endangered species acts, and ensures that the impacts are mitigated below a <br />San Joaquin County PA-1900030/Powell <br />Community Development Page 4