Laserfiche WebLink
Other sources used: <br />7. Hazards: <br />Will the project create a risk of explosion; release, generate or store <br />Any hazardous substances; or cause other dangers to public health and <br />safety? 0Yes Z No <br />Are there any known hazardous substances located within 500 feet of <br />the boundaries of this project, if in an existing or proposed residential <br />area (this could include possible groundwater contamination)? ZYes Z No <br />Will the project result in interference with, or need, for emergency plans? 111Yes Z No <br />Other sources used: <br />8. Utilities and Public Service: <br />**Will the project require alteration of, addition to, or the need for new <br />utility systems (water, sewer, drainage, solid waste), including a <br />sphere of Influence or district boundary change? <br />**Will the project result in the need for or the expansion of the following <br />services: fire and police protection, schools, parks and recreation, <br />libraries, roads, flood control, solid waste or other public works <br />Z facilities, public transit, or governmental services? ['Yes No <br />Will the project adversely impact existing recreational/park <br />opportunities or require new park/recreation opportunities? DYes Z No <br />Note: ** "Yes" answers to these two questions and 9 (b) below will require <br />additional discussion, but do not necessarily indicate a potentially significant impact. <br />Other sources used: <br />9. Transportation/Circulation: <br />Will the project generate significant traffic volumes and/or make a <br />significant contribution to an existing circulation problem (consider <br />existing LOS on nearby arterials and highways, road design, access, <br />parking, accident potential)? <br />**Will the project cause special transportation considerations (consider <br />water-borne, rail, air, pedestrian, and bicycle traffic, and public <br />transportation systems and parking facilities)? ['Yes Z No <br />Will the project result in a significant increase in commuting to and <br />from the local community? ElYes Z No <br />Will the project be impacted by or interfere with an airport flight path? ['Yes Z No <br />Will the project restrict access to the surrounding area? ZYes Z No <br />Other sources used (note traffic studies): <br />111Yes Z No * <br />Yes Z No* <br />Initial Study - 4 - Rev 5-00