Laserfiche WebLink
19 December 2018 <br /> PA-1800305 (SA) Project - 3 - <br /> San Joaquin County <br /> i <br /> I <br /> (SWPPP). <br /> For more information on the Construction General Permit, visit the State Water Resources <br /> Control Board website at: <br /> http:/Iwww.waterboards.ca.gov/water_issues/programs/stormwater/constpermits.shtmI <br /> Phase I and II Municipal Separate Storm Sewer System (MS41 Permits' <br /> The Phase I and II MS4 permits require the Permittees reduce pollutants and runoff flows <br /> from new development and redevelopment using Best Management Practices (BMPs) to <br /> the maximum extent practicable (MEP). MS4 Permittees have their own development <br /> standards, also known as Low Impact Development (LID)/post-construction standards that <br /> include a hydromodification component. The MS4 permits also require specific design <br /> concepts for LID/post-construction BMPs in the early stages of a project during the <br /> entitlement and CEQA process and the development plan review process. <br /> For more information on which Phase I MS4 Permit this project applies to, visit the Central <br /> Valley Water Board website at: <br /> http://www.waterboards.ca.gov/centralvalley/water_issues/storm water/municipal_perm its/ <br /> For more information on the Phase 11 MS4 permit and who it applies to, visit the State <br /> Water Resources Control Board at: <br /> http://www.waterboards.ca.gov/water_issues/programs/stormwater/phase_ii_municipal.sht <br /> ml <br /> Industrial Storm Water General Permit <br /> Storm water discharges associated with industrial sites must comply with the regulations <br /> contained in the Industrial Storm Water General Permit Order No. 2014-0057-DWQ. <br /> For more information on the Industrial Storm Water General Permit, visit the Central Valley <br /> Water Board website at: <br /> http://www,waterboards.ca.gov/centralvalley/water_issues/storm_waterfindustrial_general_ <br /> permits/index.shtmi <br /> Clean Water Act Section 404 Permit <br /> If the project will involve the discharge of dredged or fill material in navigable waters or <br /> wetlands, a permit pursuant to Section 404 of the Clean Water Act may be needed from the <br /> United States Army Corps of Engineers (USAGE). If a Section 404 permit is required by <br /> the USACE, the Central Valley Water Board will review the permit application to ensure that <br /> discharge will not violate water quality standards. If the project requires surface water <br /> drainage realignment, the applicant is advised to contact the Department of Fish and Game <br /> for information on Streambed Alteration Permit requirements. <br /> ' Municipal Permits=The Phase I Municipal Separate Storm Water System(MS4) Permit covers medium sized <br /> Municipalities(serving between 100,000 and 250,000 people)and large sized municipalities(serving over <br /> 250,000 people). The Phase II MS4 provides coverage for small municipalities, including non-traditional Small <br /> MS4s,which include military bases,public campuses, prisons and hospitals. <br />