Laserfiche WebLink
is . #L__ <br /> UNDERGROUND STORAGE TANK REro� 0 2 6 2 012 <br /> RESPONSE PLAN - PAGE 1 l' (One r: <br /> er facili ) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION Rol, <br /> I. FACILITY INFORMATION <br /> FACILITY ID d (Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) 3. <br /> CRUISERS MANTECA - BP # 29 _ <br /> BUSINESS SITE ADDRESS 103• 1 BUSINESS SITE CITY 104. <br /> 1137 W. LATHROP RD. MANTECA, CA. 95336 <br /> H. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that j <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 finds that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc,will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> I. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or cleanup hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete nl y f applicable) <br /> EQUIPMENT LOCATION A VATLABTLITY <br /> RIO. R20. Available during regular Rao. <br /> OPTI-SORB(KITTY LITTER) BACKROOM business hours thru Cashier <br /> 30 lbs. SPILL CONTAINMENT R11. R21. Available during regular R31. <br /> KIT absorbent snakes, booms BACKROOM business hours thru Cashier <br /> 1 - 55 GALLON DRUM FOR R12. R22. R32. <br /> LIQUID WASTES OUTSIDE BY THE DUMPSTER ALWAYS AVAILABLE <br /> 1 -55 GALLON DRUM FOR R13. R23. R33. <br /> SOLID WATES OUTSIDE BY THE DUMPSTER ALWAYS AVAILABLE <br /> R14, R24. R34. <br /> R15. R25. R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)TS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Rao. TITLE R50 <br /> SCOTT CASTLE Bo ett Petroleum VP Retail Operations <br /> NAME Rat. TITLE R51. <br /> RICK JEWELL Bo ett Petroleum Maintenance Supervisor <br /> NAME R42. TITLE R52. <br /> ROHDA HENRY Bo ett Petroleum CUST. SERV.COORD. <br /> NAME R43. TITLE R53. <br /> TONY STANFILL Bo ett Petroleum DISTRICT MANAGER <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ®1. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION ®2. INSPECTION BY QUALIFIED PERSONS N 3. RECALIBRATION OF EQUIPMENT Rho <br /> UN-022B www.unidoes.org 1/4-Rev.12/14/10 <br />