Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> F� UNDERGROUND STORAGE TANK <br /> MONITORING PLAN -(Page 1 of 2) <br /> 490-I. <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Onl)) 1 <br /> BUSINESS NAME(SanreasFacility lVameorDBA) CRUISERS MANTECA - BP# 29 3. <br /> BUSINESS SITE ADDRESS 103• CITY MANTECA, CA. I°' <br /> 1137 W. LATHROP RD. 95336 <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> bthe eyui mp ent manufacturers'instructions,or annually whichever is more frequent.Such work must be performed by qualified personnel.(23 CCR§2632,2634,2638,26411 <br /> 490.38 <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY [1 99,99,OTHER(Specify):( p a9oab. <br /> III. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLANIMAP SUBMITTED WITH THIS PLAN [12.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR 12632,2634) 490.4, <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Ch 0.k 1 <br /> that <br /> 1,CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490.5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,2634] <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 190.6. <br /> PANEL MANUFACTURER: VEEDER ROOT 49"- MODEL#: TLS-350 490-8. <br /> LEAK SENSOR MANUFACTURER: VEEDER ROOT 490-9. MODEL#(S)_ 420 490-10. <br /> -T_72.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR 126431 490-11. <br /> PANEL MANUFACTURER: 490.12. MODEL#: 490.13. <br /> 490.15. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490.16. <br /> ❑ d,MONTHLY ❑ e,OTHER(Specify): 490.17. <br /> 490-1s. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b,0.2 g.p.h. ^❑ c.OTHER(Specify): 490.19. <br /> ❑_ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.11 49x20' <br /> �❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§26451 TESTING PERIOD: 490.22. <br /> ❑ a.36 HOURS [Ib.60 HOURS 490-23. <br /> 490.23. <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.1] <br /> 490.24. <br /> _ TEST FREQUENCY: ❑ a.ANNUALLY _ ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-25. <br /> 490-26. <br /> ❑ <br /> 99.OTHER(Specify): 490.27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) thatack 111 <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490.28. <br /> [23 CCR SECONDARY CONTAINMENT IS: ❑ a.DRY [Ib.LIQUID FILLED ❑ c.PRESSURIZED [Id.UNDER VACUUM 190.29. <br /> §2636] 490.70. 490.31. <br /> PANEL MANUFACTURER:VEEDER ROOT MODEL#: TLS-350 <br /> LEAK SENSOR MANUFACTURER; VEEDER ROOT 490-32. MODEL#(S): 208 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑ a,YES ❑ b.NO 490.34. <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-35. <br /> y[] 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490.36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.123 CCR§26361 <br /> 0.90-37. MODEL#(S): a9o•3a. <br /> MLLD MANUFACTURER(S): <br /> _ _ <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3,0 g.p.h.LEAK TESTS.(23 CCR§26361 490.39. <br /> ELLD MANUFACTURER(S):VEDER ROOT 4140. MODEL#(S): RED JACKET 49041. <br /> PROGRAMMED IN LINE LEAK TEST; ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49042. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49043. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. [I a.YES El b.No 49044 <br /> 4.PIPE INTEGRITY . <br /> _ TESTING. .__--._.__ - - 49045. <br /> ❑ <br /> 49046. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) _490.47. _ <br /> 490.48. <br /> ❑ 5.VISUAL PIPE MONITORING, <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 49049. <br /> _ _ •Allowed for monitoring of unburied emergency generator fuel piping only per HSC§25281.5(b)(3) <br /> [J-6-.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(a)(3)] ago-so. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. _- 490.51. <br /> '- 490.52. <br /> ~❑ <br /> 99.OTHER(Specify) 490-53. <br /> UPCF UST-D(12/2007)-1/5 www.unidoes.org <br />