Laserfiche WebLink
vIFIED PROGRAM CONSOLIDATED F <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Pae 1 of 2) <br /> TYPE OF ACTION ❑ 1,NEW PLAN ® 2,CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-1 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1 <br /> BUSINESS NAME(Same as Facility Name or DBA) 3 <br /> CRUISERS MANTECA # 29 <br /> BUSINESS SITE ADDRESS 103 CITY MANTECA, CA, '°°' <br /> 1137 W. LATHROP RD 95336 <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions,or annual)y, whichever is more frequent.Such Nvork must be performed by qualified personnel.[23 CCR§2632,2634,2638,26411 <br /> MONITORING EQUIPMENT IS SERVICED ® L ANNUALLY [:1 99.99.OT14ER S 490-3a. <br /> Q ( P •7)� 490-1b. <br /> III. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,26341 4904. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) "heack all <br /> that1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.(23 CCR§2632,26341 <br /> SECONDARY CONTAINMENT IS: N a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ® d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: VEEDER ROOT 490-1. MODEL#: TLS-350 490-8. <br /> LEAK SENSOR MANUFACTURER: VEEDER ROOT 490"9' MODEL#(S): 420 490-10. <br /> '=-2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR§2643) 490-11. <br /> PANEL MANUFACTURER: 490.12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a,0.1 h. __❑ b.0.2 490-18. <br /> g.p.h. g.p.h. ❑ c.OTHER(Specify): 490.19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[z3 CCR 42646.11 490-20 <br /> [34.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§26451 TESTING PERIOD: ❑ a.36 HOURS El b.60 HOURS 494 -Ti <br /> ❑ 5.TANK INTEGRITY TESTING PER 123 CCR§2643.11 490-23. <br /> TEST FREQUENCY: ❑ a.ANNUALLY_ ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 49°24. <br /> Q �a90-zs. <br /> ❑ <br /> 99.OTHER(Specify): _ -27. - <br /> 490-27. <br /> he <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (C <br /> tap ll) <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-18. <br /> (226 6] SECONDARY CONTAINMENT IS: Ela.DRY ❑ b.LIQUID FILLED El c.PRESSURIZED 29 d.UNDER VACUUM 490-29. <br /> PANEL MANUFACTURER:VEEDER ROOT 490-30. MODEL#: TLS-350 490-31. <br /> LEAK SENSOR MANUFACTURER: VEEDER ROOT 490-32. MODEL#(S): 208 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑ a,YES ❑ b.NO 491-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-35. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.(23 CCR§26361 <br /> MLLD_MANUFACTURER(S): 490-37. MODEL#(S): 490"38' <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§2636] 490-39. <br /> ELLD MANUFACTURER(S):VEEDER ROOT 490-40. MODEL#(S): 0848480-001 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 410.43. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-44' <br /> ❑ 4.PIPE INTEGRITY TESTING. 490-45. <br /> _ FREQUENCY: _ ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(S eci <br /> 490-46. <br /> TEST FRE <br /> Q P fY) _ 490.47.__ <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49. <br /> ,^ •Allowed for monitoring of unburied emergency generator fuel piping onlZper ECSC 2528 I_5i�� -� <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(-)(3)) 490-50. <br /> _❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> ❑ <br /> 99.OTHER(Specify) 490-52." <br /> 490-53. <br /> UPCF UST-D(12/2007)-1/5 www.unidoes.org <br />