Laserfiche WebLink
Ulf rILD PROGRAM CONSOLIDATED FORD. <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN — (Page 2 of 2) <br /> Ch <br /> VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING atap aR <br /> that l <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54a. <br /> --0 <br /> 4.NO DISPENSERS _...__.__..._.__--...._................_.____.._.._._0---99YOTHER(Specify) 490.54b. <br /> LEAK MONITOR MANUFACTURER:VEEDER ROOT 490-5s MODEL#:794390-304 ago-59 <br /> LEAK SENSOR MANUFACTURER:VEEDER ROOT 49asz MODEL#(S):794380-208 ago-ss. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. Z a.YES ❑ b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Z a.YES ❑ b.NO 490-60 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Z a.YES ❑ b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. Z a.YES ❑ b.NO 490-62 <br /> .._.........................._.............................._-...........-..........-.........................__.....-._._,...-,_._._.._.- -._........................................................_........................_....-..._............................._................-._..__.............................._....._....._.... __..._.............._..............-_.. —--..._...._.....................-._ <br /> UDC CONSTRUCTION IS: ❑ 1.SINGLE WALL Z 2.DOUBLE WALL 490-63. <br /> IF DOUBLE WALL: 490-64a, <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: Z a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ® a.YES ❑ b.NO 490-64b. <br /> VII. PERIODIC SYSTEM TESTING <br /> 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DFTECTIQNIE-_L-Dj MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.[23 CCR 12644.11 <br /> Z 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. ago-66 <br /> Z 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67, <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 490-68. <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.E UIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> Z Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490-69a. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> Z THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-69b. <br /> Z OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-69c. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490-69f <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-69g. <br /> ❑ 490-69h. <br /> OTHER(Specify): <br /> 490-69i. <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70. <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: 0,imFI u, L.Irvi[T- GO lt, <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. 't) <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-71 <br /> ELD TESTING IS SCHEDULED FOR 10/14/2009 PER RICK JEWELL Bo ett Petroleum -Maint. Supervisor) <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: l.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by thisplan occurs;2.)all conditions that indicate_a possible release are investigated and 3,Z1 monitoring records are maintaineddroperll --___......__................_....... <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: KAREN ARNAIZ 490-72 TITLE:DESIGNATED OPERATOR 490-73 <br /> f NAME: ROSE FARHOUD 490-74 TITLE:STORE MANAGER 490-75 <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that t on provided herein i true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE: 490-77 <br /> 9/21/2009 <br /> REPRESENTING:❑I.Tank Owner/Operator 2.Fa ifity Owner/Operator 0 3.Authorized Re ese ative of Owner 490-76. <br /> APPLICANT NAME(print): 490-78 APPLICANT TITLE 490-71) <br /> BOYETT PETROL M c/o ROHDA HENRY CUSTOMER SERVICE COORD <br /> UPCF UST-D(12/2007)-5/7 www.unidocs.org <br />