My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
1137
>
2300 - Underground Storage Tank Program
>
PR0530093
>
COMPLIANCE INFO_2009 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 2:35:07 PM
Creation date
11/19/2019 2:19:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2011
RECORD_ID
PR0530093
PE
2351
FACILITY_ID
FA0019793
FACILITY_NAME
CRUISERS MANTECA #29
STREET_NUMBER
1137
Direction
W
STREET_NAME
LATHROP
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
19724002
CURRENT_STATUS
01
SITE_LOCATION
1137 W LATHROP RD
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 2 sets of plans & applications as originals will be retained by EHD) <br /> 1. Site map enclosed YES [I NO <br /> 2. Manufacturer's spec sheets attached for all equipment to be installed YES [] NO [j <br /> cJCf�e-r'C��K Q•d-S• <br /> 3. Description of work to be completed (If adding piping,-UDC's, or other UST equipment, or performing tank top upgrade, <br /> use the UST Installation Application pages 4-8 as necessary for a timel plan review): <br /> :1-: t�..i i k Su Sal 1 t- 46 i t 6 a rCt� Q 55 QG� O ��WJA <br /> to V0 5kl�vr-t, Isco veR-Dex P-o of F--&Wa -0ceaQ,r <br /> 4. Description of equipment to be used (Attach drawings/blueprints as necessary): <br /> 5. All equipment is State certified or approved. YES;Q NO [] <br /> 6. Decontamination Procedures: <br /> a. Will piping be decontaminated prior to removal? YES [] NO [] <br /> b. Identify contractor performing decontamination: <br /> Name Phone(_) <br /> Address City Zip <br /> c. Describe method to be used for decontamination: <br /> d. Describe how rinsate material will be stored onsite prior to manifesting offsite: <br /> e. Rinsate Hauler and permitted Treatment, Storage & Disposal Facility: <br /> Hauler Name Phone(_) Hauler Reg# <br /> Address City Zip <br /> Permitted Disposal Site <br /> 7. a. Describe the method that will be utilized to purge and/or inert the piping: <br /> b. Piping Hauler: <br /> Phone <br /> Name ( ) <br /> Address City Zip <br /> Hauler Registration#(if hauled as hazardous) <br /> c. Piping Disposal Site: <br /> Name Phone ( ) <br /> Address City Zip <br /> EPA ID#(if transported to a permitted TSD facility) <br /> 8. Is the sampling firm an independent third party from the contractor? YES [] NO [] <br /> 9. Describe, in detail, how the soil and/or water sample(s) beneath the piping or dispenser will be obtained: <br /> 10. Handling of excavated soil (Contaminated Soil Hazardous Waste Hauler): <br /> Name Hauler Registration# Phone ( ) <br /> Address City Zip <br /> b) If soil is not to be hauled, describe what will be done with it: <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.