My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
1137
>
2300 - Underground Storage Tank Program
>
PR0530093
>
COMPLIANCE INFO_2009 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 2:35:07 PM
Creation date
11/19/2019 2:19:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2011
RECORD_ID
PR0530093
PE
2351
FACILITY_ID
FA0019793
FACILITY_NAME
CRUISERS MANTECA #29
STREET_NUMBER
1137
Direction
W
STREET_NAME
LATHROP
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
19724002
CURRENT_STATUS
01
SITE_LOCATION
1137 W LATHROP RD
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equipment: Check thls box if tank gauging is used only for Inventory control. <br /> Check this box it no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment Is used to perform leak detection monitoring- <br /> Complete the following checklist: <br /> Yes ❑ No- Has all Input wiring been inspected for proper entry and termination,Including testing for ground faults? <br /> I Yes u No' Were all tank gauging probes visually Inspected for damage and residue buildup? <br /> I Yes 6 No. Was accuracy of system product level readings tested? <br /> Yes No' Was accuracy of system water level readings tested? <br /> Yes u No' Were all probes reinstalled properly? <br /> Yes ij No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> `In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): r1 Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> X Yes a No' For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check a/1 <br /> I! N/A that apply) Simulated leak rate; IF3 g.p.h.; Q0.1 g_p.h; r,10-29.p-h, <br /> qC Yes I_i No' Were all LLps confirmed operatlonal and accurate within regulatory requirements? <br /> Yes -1 No' Was the testing apparatus properly calibrated? <br /> Yes -i No' For mechanical LLDs,does the LLD restrict product flow If It detects a leak? <br /> Y. NIA <br /> Yes ri No' For elactronlo t.LDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 3 N/A <br /> !x Yes !t No, For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> u N/A disconnected? <br /> x Yes C No' For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> LI N/A faits a test? <br /> I.1 No' For elect-onic LLDs,have all accessible wiring connections been visually Inspected? <br /> N/A <br /> Yes rj No' -Were all items on the equipment manufacturer's maintenance checklist completed? <br /> "In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of d 12107 <br /> 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.