Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: Check thls box if tank gauging is used only for Inventory control. <br /> Check this box it no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment Is used to perform leak detection monitoring- <br /> Complete the following checklist: <br /> Yes ❑ No- Has all Input wiring been inspected for proper entry and termination,Including testing for ground faults? <br /> I Yes u No' Were all tank gauging probes visually Inspected for damage and residue buildup? <br /> I Yes 6 No. Was accuracy of system product level readings tested? <br /> Yes No' Was accuracy of system water level readings tested? <br /> Yes u No' Were all probes reinstalled properly? <br /> Yes ij No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> `In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): r1 Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> X Yes a No' For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check a/1 <br /> I! N/A that apply) Simulated leak rate; IF3 g.p.h.; Q0.1 g_p.h; r,10-29.p-h, <br /> qC Yes I_i No' Were all LLps confirmed operatlonal and accurate within regulatory requirements? <br /> Yes -1 No' Was the testing apparatus properly calibrated? <br /> Yes -i No' For mechanical LLDs,does the LLD restrict product flow If It detects a leak? <br /> Y. NIA <br /> Yes ri No' For elactronlo t.LDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 3 N/A <br /> !x Yes !t No, For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> u N/A disconnected? <br /> x Yes C No' For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> LI N/A faits a test? <br /> I.1 No' For elect-onic LLDs,have all accessible wiring connections been visually Inspected? <br /> N/A <br /> Yes rj No' -Were all items on the equipment manufacturer's maintenance checklist completed? <br /> "In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of d 12107 <br /> 2/21/07 <br />