My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
1137
>
2300 - Underground Storage Tank Program
>
PR0530093
>
COMPLIANCE INFO_2017 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 2:36:09 PM
Creation date
11/19/2019 2:48:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017 - 2018
RECORD_ID
PR0530093
PE
2351
FACILITY_ID
FA0019793
FACILITY_NAME
CRUISERS MANTECA #29
STREET_NUMBER
1137
Direction
W
STREET_NAME
LATHROP
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
19724002
CURRENT_STATUS
01
SITE_LOCATION
1137 W LATHROP RD
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJ O A Q U I N Environmental Health Department <br /> COUNTY <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans &applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES [] NO [A <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced. Ensure a copy of <br /> the"Site Health and Safety Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements. If repairing a component, describe <br /> how this will be done. (If adding piping, LIDC's, or other UST equipment, or performing tank top upgrade, <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review): <br /> Ve,t�&o v k_ cy, VT.Q(a.(_,L 4!�_,& 1xvL ce l b� a+ 1 rl 'SIT V, <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> �r p (Sem "a- <br /> 5. Decontamination Procedures: <br /> a. Will piping be decontaminated prior to removal? YES [] NO [] <br /> b. Identify contractor performing decontamination: <br /> Name Phone (_) <br /> Address City Zip <br /> 3of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.