Laserfiche WebLink
TM <br /> SUPERIOR PERFORMANCE; <br /> EASY INSTALLATION <br /> • Cathodic protection, dielectric isolation not required. <br /> • GLASTEEL IIT""tanks still come with Modern Steel Primary Tank <br /> Annular Space for Monitoring <br /> Welding's 30-year limited warranty. FRP secondary Jacketed <br /> Containment Tank <br /> • Your GLASTEEL IITM tank, when completed, will be <br /> delivered on time. Cost saving regional delivery can <br /> also lower your freight charges. <br /> • Simple low cost installation procedures require no <br /> special backfill aggregate procedures to maintain <br /> structural integrity. <br /> Additionally. Glasteel I1111 tanks are shipped to the <br /> jobsite with a vacuum established within the annular <br /> space. Once this vacuum is confirmed to meet the <br /> i <br /> "Testing" criteria as established by the NFPA and <br /> referenced in our Glasteel II?11 Installation Instructions, <br /> no additional air test is required prior to installation. <br /> This saves time and money for our clients. <br /> d � <br /> ., <br /> 1 ! 1 11 1 <br /> 1 1 1 1 1 1 <br /> 1 1 1 1 ! 1 1 <br /> -. <br /> �•: i <br />