My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
1137
>
2300 - Underground Storage Tank Program
>
PR0530093
>
INSTALL_2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 2:35:19 PM
Creation date
11/19/2019 2:57:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2009
RECORD_ID
PR0530093
PE
2351
FACILITY_ID
FA0019793
FACILITY_NAME
CRUISERS MANTECA #29
STREET_NUMBER
1137
Direction
W
STREET_NAME
LATHROP
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
19724002
CURRENT_STATUS
01
SITE_LOCATION
1137 W LATHROP RD
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Avoid personal contact with the piping system while it is Silt the "patch" longthwise <br /> pressurized during testing except for ach,al checking Of twice and remove a section so <br /> the joints for leaks. Absolutely no one should be in the that about three-fourths of the <br /> trench while the pipe is being initially preeeurized for leak Circumference remains. <br /> testing. Notify all site personnel before beginning the Thoroughly sand the Inner <br /> testing procedure. surface of the patch and sand a <br /> corresponding area on the pipe <br /> • Do not straddle the pipe during testing or while checking around the damaged section. <br /> the piping system for possible leaks. Use coarse sandpaper, a file, <br /> or a disc sander to remove all <br /> • While the pipe is being checked for leaks, do not stand gloss from the surface to be <br /> at the end of the piping system or where it changes bonded. <br /> directions. If solvent Is used to clean all b ding surfaces, allow the <br /> solvent to evaporate then apply <br /> CAUTION. Failure to striotty follow these inotruotione oan a thick coating of adhesive to <br /> result in serious personal injury, death, and/or property both surfaces, snap the patch <br /> darnago. in place, and apply pressure <br /> L= <br /> with hose clamps or banding <br /> • After the piping has passed the 50 prig (0.345 MPa) material until the adhesive hardens, The clamps may be <br /> pressure teat, we recommend the contractor reduce the lett on or removed after curing. <br /> product line pressure to a pressure of not more than 25 Replace the protective mesh covering if the repair Is made <br /> psig(0.172 MPa)and maintain this pressure until all paving on 2"pipe. <br /> has been completed. Leave pressure gauge on each line <br /> for inspection. The contractor should check the gauge Repairing Extensive Damage <br /> daily to verify the pipe is holding pressure. When the damaged area in the pipe wall is larger than two <br /> If a leak is encountered during the test procedure,immediately riches(50 mm)In diameter,follow these Instructions: <br /> release all pressure in the piping system and refer to page 1 <br /> for proper repair procedures. Upon completing any necessary For 2" pipe, cut the protective mesh covering and slide <br /> repairs to the piping system,follow the proper testing sequence away from damaged area. <br /> and verify the system's integrity_ When damage is local (less than two inches/50 mm long <br /> but more than two Inches/50 mm around the circumference <br /> Vaouum or inert Gas Teat Pr000duroo of the pipe), check to sae if there Is enough slack In the <br /> Testing with vacuum and/or pressurized inert gases have been pipe to cut out the damaged section_ if so, cut out the <br /> successfully used with our piping systems. Although helium damaged section,reteper the cut grids,and bond a sleeve <br /> testing in a closed atmosphere and at measured levels Is useful, coupling between the tapered ends. Make sure the joints <br /> testing in the field with helium has shown inconsistencies when are locked up and fully cured before pressure testing the <br /> attempting to Identify leak location. repair. <br /> Do not use these testing procedures for Fled Thread IIA sec- If the pipe Is buried, excavate a working area large enough <br /> onderycontainment plping systems. Refer to page 17. to allow for tapering tool rotation. Taper the cut ends of the <br /> pipeline and Install the sleeve coupling. <br /> REPAIR PROCEDURES When damage is extensive (too large for replacement by <br /> a sleeve coupling), cut out the damaged section, taper <br /> For damaged pipe, NOV Fiber Glass Systems recommends the cut ends, and install two sleeve Couplings and a pipe <br /> only the repair methods listed below. DO NOT attempt to repair nipple. This procedure requires sufficient slack in the line <br /> ke the final joint by ilfttng the pipe(or moving the pipe <br /> damaged fittings_ Always pressure test repair work before to mato one side)to engage the bell and spigot joint. Therefore, <br /> putting the line back Into service to assure the soundness of <br /> the repaired section. Contact your local representative for It may be necessary to remove additional backfill from <br /> further Information. a buried line to allow the pipeline movement of several <br /> feet. <br /> During repair, the pipeline should not be under pressure, and — Out out the damaged section of pipe, <br /> the area to be repaired must be Clean and dry throughout the — Taper one end of a piece of pipe at least as long as <br /> procedure. the damaged section This taper will be uecd as a <br /> gauge.Out this nipple to the proper length in the <br /> Pipe patching following steps. <br /> Follow these Instructions to repair pipe wall damage where the <br /> damaged area is two inches(50 mm)or less in diameter: To determine the insertion length of the tapered ends, move <br /> one of the couplings to the side and use the end of the repair <br /> • For 2" pipe, cut the protective mesh covering and slide nipple made In the previous step to determine the dry fit Into <br /> away from damaged area. each bell. (NOTE: The dry fit must be very tight, i.e. use <br /> • Cut a length of good pipe long enough to adequately cover additional force to drive the joint together tightly enough that <br /> the damaged area and extend at least three Inches 5 It is difficult to separate.) The total length of the repair nipple <br /> mm) and preferably Is determined by adding these two measurements to the <br /> four inches (100 distance between the sleeve couplings and then adding the <br /> mrn)to either side of two make-up dimensions from Table 9. <br /> the damaged area. Patch—+® <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.