Laserfiche WebLink
1.7 Set-Up and Supplies - Front End <br /> • • 1 <br /> Set-Up and Supplies—Front Frid <br /> .. kroom must have the following in their Front End momdovc waste Accumulation Area <br /> ,.k Mh ux 16)grey biro(one JI)for cath huardo, <br /> .. OcV"Orn;one(1)forowetlkalV411k]Q <br /> •rrgwp antj Cobwed acumination tab t4.are tar ca(n <br /> -We stream hraatt grcrvs,blue,yellow,and red <br /> •2018-What to Do-potter <br /> •[VCwo+h stal oik m wined atwt dcrx,0,1a amt with current <br /> (late m the WOO(not expired) <br /> •Replacetnerd eyewash atatIms can be ardend by yw <br /> District Leader Itiro goi the Real Estate Menu <br /> •Rept xement eyewmh Mel+^,are ordered dwough Ow <br /> 'WriNtHm center <br /> •ANDrtwnt pads <br /> •Actmuialrt twigs parge,medtunt+matt) 6. <br /> •hen togwo"iVe ekamm tape r(w taint tw)ttenef <br /> •Shaepe and pen <br /> •3'Fran End hatardom wane twnder <br /> •Chemrwt Spit KA to mtowlin0 Pe+smM Protective Equipnr ,f <br /> IPPS) <br /> •Cunent Spill Cmfinger<y•tan tjW in and vntbiy pceted <br /> •Cumrtt Emergency Contingency Plan e,the s(arardous <br /> W•dste/-r der <br /> •age 5,onr*ni[died o% <br /> •A<opy cd p>•,•ge S ported tty the phooc nr,west the <br /> Marardan Waltt Axc mmlatlon Arca <br /> Notes: <br /> Every stockroom must have the following in their Front End Hazardous Waste Accumulation Area: <br /> • A metal rack with 6 grey bins(1 for each hazardous waste stream;1 for chemical spill kit) <br /> • Corresponding colored accumulation labels,one for each waste stream: brown,green,blue,yellow,and red. <br /> • 2018"What To Do"poster <br /> • Eyewash station,mounted and accessible and with current date on the bottle and not expired <br /> • Replacement eyewash stations can be ordered by your District Leader through the Real Estate Menu <br /> • Replacement eyewash bottles are ordered through the distribution center <br /> • Absorbent pads <br /> • Accumulation bags(large,medium,and small) <br /> • Non-conductive electrical tape for loose batteries <br /> • Sharpie and pen <br /> • 3"Front End hazardous waste binder <br /> • Chemical Spill Kit containing Personal Protective Equipment or PPE <br /> • Current Spill Contingency Plan filled in and visibly posted;And <br /> • Current Emergency Contingency Plan or ECP in the hazardous waste binder,with page 5 contacts filled in and a copy of <br /> page 5 posted by the phone nearest the Hazardous Waste Accumulation Area. <br /> Published by Articulate" Storyline 7 4/27/18 <br />