Laserfiche WebLink
Mopitoring System Certification <br /> E ,i ic.y <br /> D. Results of Testing/Servicing SEP 16 2016 <br /> Software Version Installed: ENVIRONMENTAL <br /> Com tete the folio ing checklist: <br /> HEALTH nE0ARTN4ENT <br /> N Yes ❑ No* Is the audible alarm operational? <br /> N Yes ❑ No* Is the visual alarm operational? <br /> El Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> E Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> E Yes ❑ No* if alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) <br /> ❑ N/A operational? <br /> ® Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate, or is electrically disconnected? If yes: -which sensors initiate <br /> positive shut-down? (Check all that apply) N Sump/Trench Sensors; N Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? E Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br /> ® N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? if so,at what percent of tank capacity does the alarm trigger? 95% <br /> ❑ Yes* N No Was any monitoring equipment replaced? If yes, identify specific sensors, probes,or other equipment replaced <br /> and list the manufacturer name and model for al I replacement parts in Section E,below. <br /> _ ❑ Yes* N No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑ Water. If yes,describe causes in Section E,below. <br /> N Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports, if applicable <br /> N Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> UN-036—316 www.unidocs.org Rev.01/17/08 <br />