Laserfiche WebLink
Part 4: Program Fee Schedules 42 <br /> PER PER <br /> $ ANNUM HOUR <br /> HAZARDOUS MATERIALS FEES <br /> HMBP <br /> Plan Check/Consultation.............................................................................. 130' (1 hr min) X <br /> CommonMaterials....................................................................................... 70 X <br /> Regular-Primary Location............................................................................ 240 X <br /> Supplemental Chemical............................................................................... 15 X <br /> CaIARP <br /> PlanCheck................................................................................................ 90'(2 hr min) X <br /> Consultation.............................................................................................. 130'(1 hr min) X <br /> Audit Consultation...................................................................................... 130'(1 hr min) X <br /> SurchargeFee........................................................................................... 270 X <br /> RMP 5-Year Review..................................................................................... 130' (1 hr min) X <br /> FarmOperation............................................................................................ 18 X <br /> MedicalBusiness........................................................................................ 50 X <br /> UNDERGROUND STORAGE TANK PROGRAM FEES <br /> UST Facility and 1 Tank............................................................................... 550 ea X <br /> Each additional tank2............................................................................. 130 ea X <br /> State Surcharge UST Fee............................................................................ State Fee ea X <br /> Plan Review/Inspections <br /> New Tank Installation(per project)......................................................... 130' (8 hr min) X <br /> Permanent Closure(per tank)................................................................ 130' (3 hr min) X <br /> Temporary Closure(per facility)............................................................. 130' (3 hr min) X <br /> Tank Repair(lining)(per tank)............................................................... 130' (3 hr min) X <br /> Tank Retrofit(per facility)....................................................................... 130' (3 hr min) X <br /> Piping Repair(per facility)...................................................................... 130'(3 hr min) X <br /> Unauthorized Release Evaluation............................................................... 130'(1 hr min) X <br /> Unified Program Facility State Surcharge Fee........................................... State Fee` X <br /> Miscellaneous Fees <br /> Inspections/Reinspections......................................................................... 130' (1 hr min) X <br /> Complaint Inspection(w/violations)........................................................... 130' (1 hr min) X <br /> Consultation Fee....................................................................................... 130 (1 hr min) X <br /> Spill Response Activity............................................................................... 130'(1 hr min) X <br /> Enhanced Leak Detection Well Installation/Destruction Plan Check........... 130'(1 hr min) X <br /> OCT 2 3 2015 <br /> After regular office hours,on weekends and on holidays,an overtime hourly rate calculated at one and one half times this amount is charged. A <br /> minimum of three(3)hours at this overtime hourly rate will be charged for Call Back inspection/response services. <br /> 2 Existing underground storage tank(s)(UST),as defined in CCR Title 23,that have not been permitted and registered,and subject to all the <br /> requirements of State and Federal law,as well as annual permit fees for the five years prior to the date of discovery,applicable penalties and state <br /> surcharge fees. <br /> 3 Unified Hazardous Waste and Hazardous Materials Management Regulatory Program(Unified Program)Underground Storage Tank State Surcharge <br /> Fee is established by the Cal/EPA Secretary on an annual basis and assessed as described in the HSC. <br /> Unified Program Facility State Surcharge Fee is established on an annual basis by the Cal/EPA Secretary and is applied on a per facility basis. <br /> Facilities with more than one Unified program component will be charged one Unified Program Facility Surcharge Fee per year. This includes any <br /> additional Unified Program surcharge fees established by the Legislature. <br /> SJC Environmental Health Department Fee Schedule August 1, 2014 <br />