My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
2962
>
1300 - Housing Abatement Program
>
PR0523358
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 9:28:29 AM
Creation date
11/20/2019 10:21:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1300 - Housing Abatement Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0523358
PE
1322
FACILITY_ID
FA0015782
FACILITY_NAME
MENDEZ, JOSE L
STREET_NUMBER
2962
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17119029
CURRENT_STATUS
02
SITE_LOCATION
2962 S B ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\ssangalang
Tags
1300-Public
Description:
Access to EHD-Public for 1300 Program Code - CDD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br /> (209)942-1925 <br /> Fax(2' '42-1925 '51 <br /> McMaster Construction <br /> 3231 Michigan Ave. fz� <br /> Stockton, CA. 95204 M C M A S T E R CONSTRUCTION <br /> Ccl# 669006 <br /> (209) 688-8027 <br /> PATRICK McMASTER <br /> General Contractor <br /> Date: July 11,2007 Lic.#669006 Stockton,CA <br /> To: Allen Biedermann <br /> Re: Compliance 2862 " B " ST" <br /> From: Patrick McMaster Construction <br /> Dear Sir, <br /> I propose to due the work necessary to comply with your letter of violations and <br /> Building Dept. requirements in order for Mrs. Young to reoccupy her home. <br /> The floor plan provided shows four areas to be demolished and cleaned up and four <br /> areas to be remodeled and brought up to Building Dept,. requirements for livable area. <br /> The demolition will start as soon as we get a permit and be completed within two to <br /> three weeks. The site will be left clean and safe. <br /> The remodel portion will be done in accordance with building dept. requirements. <br /> We sincerely hope we can take care of this as soon as possible. <br /> Thank you very <br /> �much, <br />
The URL can be used to link to this page
Your browser does not support the video tag.