My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
2962
>
1300 - Housing Abatement Program
>
PR0523358
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 9:28:29 AM
Creation date
11/20/2019 10:21:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1300 - Housing Abatement Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0523358
PE
1322
FACILITY_ID
FA0015782
FACILITY_NAME
MENDEZ, JOSE L
STREET_NUMBER
2962
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17119029
CURRENT_STATUS
02
SITE_LOCATION
2962 S B ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\ssangalang
Tags
1300-Public
Description:
Access to EHD-Public for 1300 Program Code - CDD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. PROBLEM PHASE <br /> A. Date of Original Posting and some of the hazardous or substandard <br /> conditions existing on the property on the day of posting: <br /> On October 25, 2004 two single-family dwellings were posted 404b of <br /> the uniform code of abatement of dangerous buildings. <br /> Conditions on the day of posting include: Fire hazard, general <br /> dilapidation and improper maintenance. <br /> IV. OTHER INFORMATION <br /> A. Contacts with the owner: <br /> None <br /> B. Current Status: <br /> No substandard inspections hvew been issued by CDD. There are no repair <br /> permits. A site inspection on March 16, 2005 found work in progress. <br /> V. RECOMMENDATION PHASE for Rehabilitation of the substandard <br /> structures <br /> The Environmental Health Department recommends the owner be given: <br /> 1) Thirty (30) days to obtain demolition and/or repair permits from CDD <br /> 2) Sixty (60) days to final all permits with CDD and EHD. <br /> THE RESIDENTIAL STRUCTURES ARE TO BE KEPT VACANT UNTIL THE <br /> REPAIRS HAVE BEEN COMPLETED AND THE COMMUNITY DEVELOPMENT <br /> DEPARTMENT (CDD) AND THE ENVIRONMENTAL HEALTH DEPARTMENT <br /> (EHD) PERMITS HAVE BEEN FINALED. IF ANY OF THE ABOVE TIME <br /> CONSTRAINTS ARE NOT MET, THE ENVIRONMENTAL HEALTH <br /> DEPARTMENT (EHD) SHALL PROCEED WITH ABATEMENT WITHOUT <br /> FURTHER REPORT TO THE BOARD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.