My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
800
>
2900 - Site Mitigation Program
>
PR0539293
>
WORK PLANS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 3:04:24 PM
Creation date
11/20/2019 3:01:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0539293
PE
2957
FACILITY_ID
FA0022465
FACILITY_NAME
VALLEY MOTORS
STREET_NUMBER
800
Direction
E
STREET_NAME
MAIN
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
800 E MAIN
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In order to track the progress of the program, we propose to collect a sample of the <br /> ,a aJ,dent,water monthly duringthe first year of operation and periodically thereafter. <br /> Fhese samples will be analyzed for:TPHg/13TEX,PCE,and its daughter products TCE <br /> and 1,2-DCA. We do not anticipate analyzing for gasoline oxygenates,because several <br /> years of quarterly monitoring,as well as the data from the 2009 pumping test,prove tha�',/ i <br /> oxygenates are not present at this site. <br /> 6.0 SCHEDULE <br /> The operation.proposed in section 4.0 implies that site visits will be made twice weekly; <br /> once to start the extraction process and a second time to collect the effluent sample. The <br /> following week;after the analytical results are received,the first trip will be to start the. <br /> disposal process and a second trip will be made to re-start the extraction process when <br /> disposal is complete. It.is anticipated that each batch of 10,000 gallons could be pumped <br /> and disposed of every 10 days. Additional maintenance visits will;probably take place <br /> occasionally to check on.pump operation,possible leaks in the system, etc. <br /> Installation of the two extraction wells and the piping to the treatment compound will. be <br /> the first step in the program,but because this will involve a substantial outside vendor <br /> cost;it would not be implemented until presently outstanding invoices have been paid i <br /> and an additional reimbursement.request can be processed by the Underground Storage <br /> Tank Cleanup Fund.At this time,we cannot estimate when Valley Motors:will be able to <br /> bring the account current. It is our understanding that Valley Motors wi1.1 authorize <br /> Upgradient Environmental to move forward with the first task as soon as funding has <br /> been secured. <br /> Currently a permitao dispose of 30,000 gallons of water per month into the sewer system. <br /> is in place. Final approval to dispose of treated water can resume after initial laboratory <br /> results have been approved by MUD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.