My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004375
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
800
>
2900 - Site Mitigation Program
>
PR0539293
>
ARCHIVED REPORTS_XR0004375
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 3:29:20 PM
Creation date
11/20/2019 3:19:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004375
RECORD_ID
PR0539293
PE
2957
FACILITY_ID
FA0022465
FACILITY_NAME
VALLEY MOTORS
STREET_NUMBER
800
Direction
E
STREET_NAME
MAIN
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
800 E MAIN
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXECUTIVE SUMMARY <br /> Groundwater samples were collected from seven of the eight monitoring wells on June 14, 2005 <br /> One well was dry and could not be sampled As in past quarters, Total Petroleum Hydrocarbons in <br /> the gasoline range and benzene and/or other aromatic compounds were detected in six of seven <br /> samples In most wells, TPH-g concentrations declined by at least 50% since the wells were last <br /> sampled in January The concentration of most volatile aromatic hydrocarbons (BTEX)remain in <br /> the 0 5-3 part per billion range, except in VM-2 Concentrations in that well range from 4,120 ppb <br /> (ethylbenzene)to 17,000 ppb (toluene) <br /> The elevation of the water table was approximately 20 feet below sea level, which is 2 feet <br /> shallower than when the site was monitored in the first quarter The groundwater flow direction <br /> continues to be east <br /> A thermal oxidation soil vapor extraction unit was mobilized to the site on February 3, 2005 The <br /> underground vapor line to extraction well VT-1 was installed in March Testing of the system has <br /> been delayed until a temporary propane gas tank can be mobilized to the site to supply <br /> supplemental fuel to the extraction unit An application to install the tank was submitted to the <br /> Stockton Fire Department in May, but the tank has not been mobilized as of this date <br /> • <br /> i <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.