My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004377
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
800
>
2900 - Site Mitigation Program
>
PR0539293
>
ARCHIVED REPORTS_XR0004377
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 3:28:56 PM
Creation date
11/20/2019 3:19:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004377
RECORD_ID
PR0539293
PE
2957
FACILITY_ID
FA0022465
FACILITY_NAME
VALLEY MOTORS
STREET_NUMBER
800
Direction
E
STREET_NAME
MAIN
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
800 E MAIN
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXECUTIVE SUMMARY <br /> Groundwater samples were collected from seven of the eight monitorin wells on June 16 2004 <br /> � g <br /> One well was dry and could not be sampled Total Petroleum Hydrocarbons in the gasoline range <br /> and benzene and/or other aromatic compounds were detected in six of seven samples Except in <br /> well VM-2, nearest the source of the contamination, concentrations were similar to or slightly lower <br /> than those detected in January In VM-2, concentrations rose by 12-50 o <br /> The elevation of the water table remained�at approximately 21 feet below sea level, essentially the <br /> same as it was when the site was monitored in the fourth quarter of 2003 and the first quarter of <br /> 2004 The groundwater flow direction continues to be east <br /> The Application to Construct and Operate a soil vapor extraction system for the remediation of soil <br /> contamination at the site was approved by the San Joaquin Valley Air Pollution Control District in <br /> April An application was then submitted to the Stockton Building Department to install the <br /> electrical control panel for the vapor extraction unit, and the control panel was installed in June <br /> After final inspection by the Building Department, Pacific Gas & Electric will bring in power to the <br /> site and additional construction work will be undertaken to complete the installation Upgradient <br /> Environmental anticipates initial testing of the vapor extraction system in late July or August <br /> • <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.