Laserfiche WebLink
i <br /> • 7.0 SCHEDULE <br /> Assuming that this work plan meets regulatory approval, Upgradient Environmental wil submit a <br /> cost estimate and pre-approval form for the investigation to the UST Cleanup Fund before the end <br /> of May If approved, drilling and infection of the bacterial inoculum could take place in the latter <br /> part of June The sensitive receptor survey will be performed in early July The thi,d quarter <br /> monitoring will take place approximately one month after inoculation of the bioremediation test <br /> boring, in late July or early August The results of these investigations will be presented in the third <br /> quarter report in late August <br /> The aquifer test and soil vapor extraction/sparging tests will be scheduled for the fourth quarter, <br /> probably October and November, so that a Problem Assessment Report can be domplel ed by the <br /> end of 1999 The results of the fourth quarter groundwater monitoring will be included in the <br /> Problem Assessment Report <br /> • <br /> • <br />