Laserfiche WebLink
r <br /> TABLE 1 Groundwater Elevation Measurements <br /> Project: Valley Motors, Stockton, CA <br /> Well Casing Depth to <br /> Well M # Date Measured Elevation Groundwater Elevation <br /> VM-1 7/8/96 1600 4355 -2755 <br /> 1214196 4377 -2777 <br /> 12/11/97 4047 -2447 <br /> 8118/98 3396 -1796 <br /> 10/27/98 3408 -1808 <br /> 2/18/99 3311 -1711 <br /> 5/10/99 3207 -1607 <br /> Vrvl-2 718196 1595 43 54 -2759 <br /> 12/4/96 15 59 4343 -2748 <br /> 12/11/97 40 15 -2456 <br /> 8118198 33 6 -1801 <br /> 10/27/98 33 73 -1814 <br /> 2/18/99 - 3275 -1716 <br /> 5/10/99 31 72 -16 13 <br /> VM-3 718196 1601 4376 -2775 <br /> 12/4/96 4400 -2799 <br /> 12, 11/97 4076 -2475 <br /> 8118/98 3416 -1815 <br /> 10/27/98 3429 -1828 <br /> 2/18/99 33 31 -1730 <br /> 5/10/99 3226 -1625 <br /> VM-4 8118/98 1526 3342 -1816 <br /> 10/27/98 33 54 -1828 <br /> 2/18/99 3255 -1729 <br /> 5/10199 31 53 -1627 <br /> Ground level was estimated based on USGS maps.Well elevations were surveyed <br /> using VM-1 as the base elevation. <br />