Laserfiche WebLink
CLIENT: <br /> to --� GENERAL NOTES <br /> PIPING LEGEND w 2" INSIDE 3" DOUBLE WALL FIBERGLASS PRODUCT PIPING <br /> 2" INSIDE 3" OR 3" INSIDE 4" DOUBLE WALL FIBERGLASS VAPOR RECOVERY PIPING <br /> - - - - - - - - - <br /> 2" INSIDE 3" DOUBLE WALL FIBERGLASS VENT PIPING 11N pr <br /> z TANK AND PIPING INSTALLATION NOTES <br /> PIPING LENGTHS 1 INSTALL ON�(1) OK REGULAR UNLEADED, ONE (1) 10K/12K PREMIUM UNLEADED/DIESEL DUAL COMPARTMENT "XERXES" DOUBLE WALL FIBERGLASS <br /> HYDROSTATIC ANNULAR SPACES BY "VEEDER ROOT" TLS-3508 TANK AND PIPING MONITOR AND ALARMARC0 <br /> VAPOR LINE 320' 3 YSTEM. ALSUMPS SHALL BE DOUBLE WALL FROM COLLAR TO THE BOTTOM OF TANK SLAB. SUMPS SHALL BE INDIVIDUALLY CONTINUOUSLY <br /> 91 PROD LINE 300' MONITORED BY "VEEDER ROOT" MINI HYDROSTATIC SENSORS AND STANDARD LIQUID SENSORS TIED INTO THE TLS-35OR TANK & PIPING MONITOR AND <br /> 87 PROD LINE 312' ALARM SYSTEM PER LG-162-1 REQUIREMENTS. TANKS TO BE SET MIN. 50" BELOW FINISH GRADE. SEE DWG. M.5.3.04 FOR ADDITIONAL INFORMATION. BP WEST COAST PRODUCTS,LLC <br /> _ TANK INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. <br /> -II - - - -- - - - - - - - - - -- - - DIESEL PROD LINE 279' <br /> - - T -�_ - -- - - - - � - �. - .-� - - - -- -. -- - - -- - -- - - - <br /> COLONY � ---- --- - - -- 91 VENT LINE 76' <br /> 2 INSTALL A 7" MIN. REINFORCED CONCRETE SLAB OVER TANKS. SURFACE WATER SHALL BE DIVERTED AWAY FROM EACH MANHOLE BY FORMING A <br /> 87 VENT LINE 58' CONCRETE CROWN WITH A 1-1/2" DROP IN 18" FROM THE EDGE OF THE MANHOLE RING TO THE SURROUNDING SLAB ELEVATION. TANK SLAB SHALL BE <br /> ACCESSEABEMENT DIESEL VENT LINE 71' THICKENED AT TANK SUMPS TO BE JUST BELOW TOP OF TANK SUMP'S SECONDARY CONTAINMENT TERMINATION PER AB-2481 REQUIREMENTS. CONSTRUCT <br /> SLAB PER CIVIL SLAB INSTALLATION DETAILS AND SPECIAL REQUIREMENTS SHOWN ON DETAILS. <br /> INSTALL FOUR (4) 4" EVR PHASE I APPROVED DUAL POINT FILL ADAPTERS AND CAPS. INSTALL STRAIGHT ALUMINUM DROP TUBES. (GAS & DIESEL) <br /> ❑ Q INSTALL THREE (3) 4" EVR PHASE I APPROVED DUAL POINT STAGE I VAPOR RECOVERY ADAPTERS AND CAPS. (GAS ONLY) <br /> INSTALL ONE (1) 2 HP VARIABLE SPEED TURBINE IN THE 20,000 GALLON REGULAR UNLEADED TANK (TANK #1). <br /> - INSTALL ONE (1) 2 HP VARIABLE SPEED TURBINE IN THE 10,000 GALLON DIESEL TANK COMPARTMENT #2. <br /> INSTALL ONE (1) 2 HP VARIABLE SPEED TURBINE IN THE 12,000 GALLON PREMIUM TANK COMPARTMENT (TANK #3). <br /> C TURBINE SYSTEMS TO BE EQUIPPED WITH 3 GPH ELECTRONIC LINE LEAK DETECTION. LEAK DETECTORS ARE TO BE TESTED FOR THE 3 GPH LEAK <br /> DETECTION PRIOR TO START UP. CONTRACTOR TO PROVIDE TEST DATA AT THE TIME OF PUNCH LIST AS WELL AS INCLUDE IN CLOSE OUT BINDER. SET <br /> PROPERTY UNE MM € TURBINE INTAKES AT 5" FROM BOTTOM OF TANKS. TURBINES TO BE EQUIPPED WITH INTAKE FILTER SCREENS. CONTRACTOR IS TO LABEL TURBINES AND <br /> CONTROLLERS AS TO WHICH PRODUCT THEY SERVE, GREEN CONTROLLER LIGHTS ARE TO GO OUT WHEN TURBINES ARE OFF OR LOSE POWER. <br /> Ar5C13C COM <br /> ' © INSTALL 3" INSIDE 4" DOUBLE WALL FIBERGLASS STAGE II VAPOR RECOVERY HEADER FOR "HEALY VAC ASSIST" ORVR/PHASE II EVR COMPATIBLE VAPOR <br /> 2 wtFIAu a rrm ( RECOVERY SYSTEM. SLOPE 1/8" PER FOOT MINIMUM TO TANKS. LAYOUT TANKS & STAGE II VAPOR RECOVERY PIPING SUCH THAT THE STAGE II PIPING 0 <br /> mAND 1CKIIOVkEOCE BYL'E DRAINS & ENTERS INTO REGULAR UNLEADED TANK FIRST W/ 3" CONNECTIONS, AND CONTINUES 3" TO OTHER TANKS. Z <br /> 2 I° INSTALL 3" TO 2" REDUCING TEES WHERE HEADERS BRANCH TO DISPENSERS. CONTRACTOR TO INSTALL TRACER WIRE WITH VAPOR PIPING. TESTING OF z <br /> 3 4 I3WO BVLIARO' PER CITY IW. VAPOR LINES SHALL BE PERFORMED PRIOR TO BACKFILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. THE VAPOR LINE'S INTERSTITIAL SPACE <br /> BOUAM Ta If PL/DED{ FEET SHALL BE CONTINUOUSLY VACUUM MONITORED PER LG-162-1 REQUIREMENTS. THE CONNECTION FOR THE VACUUM MONITORING SHALL BE LOCATED IN w <br /> Duk Has HWM EDW OF 1315PESISER Cm.a) 6 7 19 ^aRICL€ nLYT� PE)1 SIDE F <br /> BDE 3+1 M F 340MR THE 20,000 GALLON TANK FILL SUMP AND THE VACUUM TUBING LOOPED BACK TO THE TURBINE SUMP WHERE THE VACUUM SENSOR IS LOCATED. 0. <br /> I \ 17 17 Lu <br /> FH Lam" /0 (a) INSTALL (3) 2" INSIDE 3" DOUBLE WALL FIBERGLASS GASOLINE & DIESEL SUPPLY LINES TO DISPENSERS. PIPING SHALL BE INSTALLED PER 0 <br /> 4fT - MANUFACTURER'S SPECIFICATIONS AND INSTRUCTIONS. PIPING SHALL BE INSTALLED WITH A SLOPE OF 1/8" PER FOOT FROM THE FURTHEST <br /> N f - - = i REG- - DISPENSER SUMP DOWN TO THE TURBINE SUMPS. CONTRACTOR TO INSTALL TRACER WIRE WITH PRODUCT PIPING. TESTING OF PRODUCT LINES <br /> �10 \ SHALL BE PERFORMED PRIOR TO BACKFILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. PRODUCT LINES INTERSTITIAL SPACES SHALL 0 <br /> Z <br /> + I! r <br /> r BE CONTINUOUSLY VACUUM MONITORED PER LG-162-1 REQUIREMENTS AND TIED INTO THE "VEEDER-ROOT" TLS-350 PLUS CONSOLE. SEE (� <br /> 1 1 �lts DETAILS FOR CONNECTION LOCATIONS AND VACUUM ZONING DATA. <br /> +I ® INSTALL "VEEDER ROOT" TANK AND LINE ALARM CONTROL PANEL MODEL # TLS-350 PLUS IN BUILDING AT NORMALLY OCCUPIED LOCATION IN z <br /> II ) I �I BUILDING. SEE ARCHITECTURAL AND ELECTRICAL DRAWINGS FOR EXACT LOCATION. 0 <br /> 12 II I I I I II O <br /> I � Q9 INSTALL THREE (3) 2" INSIDE 3" DOUBLE WALL FRP VENT LINES. SLOPE 1/4" PER FOOT (1/8" PER FOOT MINIMUM) TO TANKS AS SHOWN. CONTRACTOR W > N o <br /> TO INSTALL TRACER WIRE WITH VENT PIPING. THE INTERSTITIAL SPACE OF EACH OF THE VENT LINES SHALL BE CONTINUOUSLY MONITORED VIA A VACUUM m o o rn <br /> 33 ® BUULMMG EM 9OMbkom H SENSOR TIED INTO THE "VEEDER-ROOT" TLS-350 PLUS CONSOLE PER LG-162-1 REQUIREMENTS. THE DOUBLE WALL VENT PIPING SHALL BE TERMINATED r v <br /> IN A DOUBLE WALL VENT TERMINATION SUMP THAT WILL BE HYDROSTATICALLY MONITORED AND WILL ALSO HAVE A LIQUID SENSOR INSTALL PER <br /> PLNP 3H j1 I] LG-162--1 REQUIREMENTS. V p L) <br /> �I FIX�RIIDOF �� I, I ( 10 TERMINATION POINT OF TANK VENTS TO BE A MINIMUM OF 12' ABOVE GRADE AND NOT WITHIN 5' FROM ANY BUILDING OPENING OR PROPERTY LINE 0 00 <br /> J r• Y m ro <br /> �I THAT CAN BE BUILT UPON. VENT RISERS SHALL BE INSTALLED IN ACCORDANCE WITH UNIFORM FIRE CODE REQUIREMENTS. INSTALL TWO (2) SPARE Q C� M Q <br /> a III L ALlw <br /> 0-9 *...Q �� I ( 1" CONDUITS W/ PULL ROPE FROM GASOLINE VENT RISER TO BUILDING FOR FUTURE TANK DIAGNOSTIC REQUIREMENTS. INSTALL HEALY CLEAN AIR Z W m 6 <br /> I AM 20 1 Z SEPARATOR AND ASSOCIATED PIPING AND FITTINGS PER NEW CARE EVR PHASE II STANDARDS AND E.O. INSTALLATION SHALL BE PER CARB E-0 0 ~ o X <br /> II nr�w 1 AND MANUFACTURERS INSTRUCTIONS. SEE DETAILS ON SHEET G.0.6.2 M m a Lco <br /> D MV43E � 11 INSTALL THREE (3) RIGID CONDUITS FOR SUBMERSIBLE PUMP POWER. (ONE FOR EACH TURBINE). NOTE THAT THE LAST 2 FEET OF ALL CONDUIT <br /> 10 1 <br /> ENTERING TURBINE, FILL, DISPENSER OR VENT TRANSITION SUMPS SHALL BE PVC COATED RIGID CONDUIT. NO. DATE REVISION DESCRIPTION <br /> + 10 EW HEALY CLEAN AX\\ ( 12 INSTALL TWO (2) DUAL FLOAT TANK ANNULAR SPACE HYDROSTATIC MONITORING SENSORS. <br /> AIR SEPARATOR DUAL.HIM PER 13 INSTALL BALL FLOAT/VALVE EXTRACTOR ASSEMBLIES FOR VENT, STAGE I AND STAGE II VAPOR RECOVERY AT FILL SIDE SUMP. <br /> wsraLL ED WATHE'PF QJWWRIFF SIDE 3+1 MPD I <br /> j� sTnTCH AND 1II�ATHETT PRaOF aV1ur <br /> PER nK SNR IN9110 WO FM OF� 17 14 INSTALL .1 GPH MAG PROBE TANK LEVEL GAUGES AT LOCATIONS SHOWN <br /> 110 MAIR!WATER UNHT DBS oeim i 15 TANKS SHALL BE PROPERLY MARKED AND TAGGED WITH STANDARD API IDENTIFICATION MARKINGS AND BRASS TAGS AT FILL MANHOLES. <br /> . - VAC 11M ® Luf 1fi NOT USED <br /> + 4 z <br /> c <br /> ( 17 INSTALL (6) WAYNE OVATION SERIES (3+0) SINGLE HOSE PER SIDE & (2) WAYNE OVATION SERIES (3+1) DUAL HOSE PER SIDE MULTI-PRODUCT <br /> DISPENSERS AS SHOWN. DISPENSERS TO BE FITTED WITH "VST" VAPOR BALANCE STAGE fl HOSES, NOZZLES AND BREAKAWAY VALVES PER NEW GARB <br /> IJ EVR AND ISO PHASE 11 EXECUTIVE ORDER VR-204 REQUIREMENTS. DISPENSERS SHALL BE EQUIPPED FROM MANUFACTURER WITH VEEDER-ROOT ISD <br /> u! FLOW METERS. CONTRACTOR IS RESPONSIBLE FOR INSTALLING HOSES, NOZZLES AND BREAKAWAYS. INSTALL UNDER DISPENSER CONTAINMENT <br /> Q Q <br /> O INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND MONITORING SENSORS. DISPENSER SUMPS SHALL BE DOUBLE WALL TO AT LEAST THE BOTTOM <br /> - ___ - 1 OF CONCRETE DRIVE SLAB AND HYDROSTATICALLY MONITORRED PER LG-162-1 COMPLIANCE OPTION. THE LAST 2 FEET OF ALL CONDUITS ENTERING <br /> ■' • �. `�"� *� THE DISPENSER SUMPS SHALL BE PVC COATED RIGID. FOR TYPICAL INSTALLATION DETAILS. START UP BY MANUFACTURER REPRESENTATIVE, GENERAL <br /> CONTRACTOR TO PURGE LINES WITH A MINIMUM OF 200 GALLONS THROUGH EACH HOSE/NOZZLE. ANY AIR POCKETS OR START UP PROBLEMS DUE TO <br /> IMPROPER INSTALLATION OR INCORRECT WIRING THAT DESTROYS ELECTRONICS WILL BE BILLED BACK TO THE CONTRACTOR. AFTER PURGING THE <br /> yam Boor CAum <br /> PRODUCT LINES OF AIR AND BEFORE VAPOR RECOVERY TESTING, CONTRACTOR IS TO REPLACE THE FACTORY INSTALLED GASOLINE FILTERS WITH NEW <br /> MDyTDR� <br /> 8 <br /> EMESaDYP silt-OT <br /> SEAL: <br /> yrLl <br /> gyp mi(moom 18 NOT USED <br /> I a oumw I �s E D A CH <br /> + • I + 1g ALL NEW PIPING AND TANKS TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS AND INSTALLATION INSTRUCTIONS. CONTRACTOR SHALL USE �, <br /> + <br /> FLEXIBLE CONNECTORS FROM THE TANK SUMP TO THE VAPOR RECOVERY MANIFOLD AND MAIN PRODUCT LINES OR SHALL PROVIDE AT LEAST 4 FEET OF 6 <br /> I STRAIGHT FRP PIPE RUN BEFORE A CHANGE OF DIRECTION OF MORE THAN 30 DEGREES. n <br /> v <br /> SAY -5 <br /> / i O INSTALL OVERFILL ALARM & ACKNOWLEDGMENT SWITCH, ESO AND MAINTENANCE RECEPTACLE IN LOCATION SHOWN. ALARM AND SWITCH TO BE LOCATED <br /> A ' 2Q TO PROVIDE AN UNOBSTRUCTED VIEW TO TRUCK DRIVER, PROVIDE BOLLARD PROTECTION OF FREE STANDING POLE. SEE WIRING DIAGRAM ON SHEET 9 <br /> 4 <br /> 21 FINIAL FACILITY EQUIPMENT LOCATIONS TO BE APPROVED BY BP WEST COAST DISTRIBUTION PRIOR TO SUBMITTAL FOR PERMITS TO ENSURE CLEAR AND <br /> SAFE ACCESS TO THE UNDERGROUND TANKS FOR UNLOADING OPERATIONS. <br /> f 22 N T UUSED TF OF L�F� <br /> CONFIDENTIAL�Y <br /> COMPLIANCE NOTES THE RECIPIENT OF MATERIA UNDERSTANDS THAT <br /> -- COPYRIGHT IN THE MA WNED BY GLOBAL <br /> R- ALLIANCE, AND ALSO, THAT THE MATERIALS CONTAIN <br /> PRrvILEDGED AND CONFIDENTIAL BUSINESS INFORMATION OF <br /> 1. ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR REFERENCING ALL DIMENSIONS, PROPERTY LINES, <br /> GLOBAL <br /> T}iEwSENCE. ACCORDINGLY, <br /> THE <br /> RECENCETA AGREES TO <br /> AGREES NOT TO DISCLOSE THESE MATERIALS TO ANY OTHER <br /> ELEVATIONS AND EQUIPMENT LOCATIONS PARTY AND FURTHER AGREES NOT TO MAKE COPIES OF THE <br /> 2, ALL. DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING ANY WORK. ANY MATERIALS. THE RECIPIENT AGREES TO USE THE <br /> MATERIALS ONLY FOR THE LNIITEO PURPOSE FOR WHICH <br /> DISCREPANCY SHALL BE CALLED TO THE ATTENTION OF THE OWNERS ENGINEER FOR HIS DECISION BEFORE PROCEEDING WITH GLOBAL ALLIANCE HAS MADE THE MATERIALS AVAILABLE, <br /> AND RECIPIENT AGREES TO RETURN ALL MATERIALS TO <br /> THE WORK. GLOBAL ALLIANCE EITHER UPON COMPLETION OF THE <br /> INTENDED PURPOSE OR UPON THE REQUEST OF GLOBAL <br /> 3• GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM APPLICABLE AGENCIES FOR EXCAVATIONS OF TRENCHES 5'-0" AIJANCE WHICHEVER COMES FIRST. <br /> OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND. <br /> 4. AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE SUBMITTED AND APPROVED BY GOVERNING AGENCY PRIOR TO TANK DEVELOPMENT INFORMATION: <br /> OPERATIONS. <br /> -� 5. ALL. MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS PER NATIONALLY RECOGNIZED CODES, LOCAL UNDERGR. STORAGE <br /> CODES AND GOVERNING AUTHORITIES. <br /> 6. THE UNDERGROUND STORAGE TANK SYSTEM SHALL BE COMPATIBLE WITH THE PRODUCT STORED. TANK STANDARDS <br /> 7. ALL. MONITORING DEVICES SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. ELEMENT TPO1 <br /> �f <br /> 8. GEMERAL CONTRACTOR IS REQUIRED TO PROVIDE 72 HOUR (TYPICAL) NOTIFICATION TO GOVERNING AGENCY PRIOR TO TANK Y 9.0 2010 SERIES <br /> INSTALLATION. CALIFORNIA MARKET <br /> 9. TANK AND PIPING SYSTEM TO BE INSPECTED BY OWNER'S THIRD PARTY INSPECTOR & GOVERNING AGENCY AT FOUR (4) <br /> SEPARA 1 <br /> A. ANK AI�TEST�AFRSETTING IN HOL AND SOAP TEST. 3Q SITE ADDRESS: <br /> B. TICALLY TESTED FOR 60 MINUTES. <br /> C. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN ACCORDANCE WITH COLONY RD <br /> CAUTION: MANUFACTURER'S GUIDELINES. <br /> POTENTIAL UTILITY CONFLICT. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING AND D. FINAL INSPECTION INCLUDING ALL PORTIONS OF THE LEAK DETECTION SYSTEM. @a BRADY LN <br /> NEW UTILITIES PRIOR TO CONSTRUCTION. SEE UTILITY CONFLICT NOTE THE 10. ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE HYDROSTATICALLY TESTED (LAKE TEST) WITH RIPON,CA <br /> EXISTING WATER, STORM, AND SANITARY SEWER SERVICE SHOWN IS APPROXIMATE, STANDING WATER TO TOP OF REDUCING COLLAR FOR A PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT. <br /> BASED ON FIELD SURVEYS AND "AS-BUILT" RECORDS. THE GENERAL CONTRACTOR RECORD THE TEST RESULTS AND SUBMIT TO OWNER. <br /> SHALL "POTHOLE" THE EXISTING UTILITIES TO VERIFY THE DIAMETER AND LOCATION 11. TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED BY GOVERNING 95366 <br /> (INCL. ELEVATIONS) PRIOR TO CONSTRUCTION, ANY DISCREPANCIES IN THE AGENCY PRIOR TO TANK SYSTEM BEING PLACED IN OPERATION. <br /> LOCATION THE EXISTING PIPE OR INCOMPATIBILITY OF THE DESIGN SHALL BE <br /> BROUGHT TO THE IMMEDIATE ATTENTION OF THE OWNERS REPRESENTATIVE, AND 12. PRIOR TO FUEL BEING PUMPED, STATION MUST HAVE VEEDER ROOT FUNCTIONAL AND MONITORING ANNULAR SPACES OF TANK DESIGNED BY: AGC ALLIANCE Z&OM: <br /> TO <br /> OWNERS CIVIL ENGINEER. <br /> AND DISPENSER SUMPS. <br /> 13. PAYMENT OF ALL APPLICABLE UST OPERATING FEES SHALL BE SUBMITTED TO THE GOVERNING JURISDICTION CHECKED BY: AGC BP REPM: <br /> UTILITY CONFLICT NOTE: WITHIN 30 DAYS OF THE FINAL INSPECTION. DRAWN BY: AGC ALLIANCE PM: <br /> CALMON; 14. EVIDENCE OF FINANCIAL RESPONSIBILITY SHALL BE SUBMITTED TO GOVERNING AGENCY (BY BP). VERSION: PROJECT NO: <br /> THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, 15, MEASUREMENTS OF BRINE LEVELS SHALL BE TAKEN BY BP REPRESENTATIVE DURING THREE SEPARATE VISITS TO SITE AND 8.15.10 <br /> DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON PRIOR TO FUELING OPERATIONS, REFER TO TANK MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR REQUIREMENTS. <br /> THESE PLANS OR NOT BY POT HOLING THE UTILITIES AND SURVEYING THE <br /> HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL TANK EXCAVATION NOTE: 16• TANK TEST METHOD: BEFORE THE UNDERGROUND STORAGE TANK 15 PLACED INTO USE, THE UNDERGROUND STORAGE TANK DRAWING TITLE: <br /> INCLUDE CALLING UTILITY LOCATE ® 1 (800) 227-2600 AND THEN POT SHALL BE TESTED AFTER INSTALLATION USING ONE OF THE FOLLOWING METHODS TO DEMONSTRATE THAT THE TANK SYSTEM IS UNDERGROUND TANK AND PIPING <br /> TANK EXCAVATIONS SHALL BE PER OSHA REQUIREMENTS AND BE PERFORMED <br /> HOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY PRODUCT TIGHT: <br /> CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. 1) (ENHANCED LEAK DETECTION ELD TEST (IOTA) BY CGRS OR LICENSED AFFILIATE. SITE PLAN <br /> LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED FOLLOWING THE RECOMMENDATIONS OF THE SOILS REPORT. TANKS 2) AN INERT GAS PRESSURE TEST THAT HAS BEEN CERTIFIED BY A THIRD PARTY AND APPROVED BY THE BOARD <br /> EXCAVATIONS THAT REQUIRE SHORING SHALL BE ENGINEERED AND PERMITTED AND INSTALLATION NOTES <br /> UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO SEPARATELY AND SHALL BE THE RESPONSIBILITY OF THE INSTALLING 3) A TEST METHOD DEEMED EQUIVALENT TO ENHANCED LEAK DETECTION OR AN INERT GAS PRESSURE TEST BY THE BOARD IN <br /> VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL REGULATIONS ADOPTED PURSUANT TO THE APPLICABLE CHAPTER IN THE CODE. AN UNDERGROUND STORAGE TANK INSTALLED <br /> CONTRACTOR. HIGH WATER TABLE 15 ANTICIPATED. CONTRACTOR TO SHORE <br /> CONSULT THE OWNERS CIVIL ENGINEER TO RESOLVE ALL PROBLEMS PRIOR AND DEWATER TANK HOLE EXCAVATION. FOLLOW TANK MANUFACTURER'S 0 10 20 4p Call Tall Free AND TESTED IN ACCORDANCE WITH THIS SECTION IS EXEMPT FROM THE REQUIREMENTS OF CALIFORNIA HEALTH AND SAFETY <br /> TO PROCEEDING WITH CONSTRUCTION. INSTALLATION INSTRUCTIONS FOR WET HOLE TANK INSTALLATION. 1 (800) 227-2600 CODE SECTION 25292.5. <br /> SHEET N0: <br /> TWO 17. REFERENCED CODES SHALL INCLUDE 2007 CBC; 2007 CFC, 2007 CEC; 2007 CMC. <br /> WORKING DAYS <br /> BEFORE YOU 18. FIRE SAFETY DURING CONSTRUCTION SHALL FOLLOW 2007 CFC, FIRE EXTINGUISHERS SHALL BE PROVIDED. THE AUTOMATIC FIRE <br /> 17F=20DIG SPRINKLER SYSTEM IS TO REMAIN IN SERVICE AT ALL TIMES. UNDER NO CIRCUMSTANCE SHALL THE FIRE SPRINKLER SYSTEM BE <br /> UNDERGROUND TANK AND PIPING <br /> SITE PLAN LEFT OUT OF SERVICE OVERNIGHT. <br />