Laserfiche WebLink
Kerry Sullivan <br /> COMMUNITY DEVELOPMENT <br /> PA-04-80 (SA) <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due and payable at <br /> the time of building permit application. (The fee currently is $430.00 per 1,000 gross square foot of <br /> building designated as Manufacturing in the Mountain House area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by the Engineering <br /> News Record.) (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> NOTE: Any construction activity that results in the disturbance of at least one(1) acre of soil shall require a <br /> State NPDES construction permit. <br /> DTP:DG:ar <br /> PACOMMENTS\SMYR 2004\PA-0400080 pre-application.wpd <br />