Laserfiche WebLink
New Moose Lodge SS/NLS Addendum Page 4 of 4 <br /> Our Project Number: E07175A <br /> November 26, 2007 <br /> 4.0 DISCUSSION OF NITRATE LOADING RESULTS <br /> 4.1 Total Nitrate Impact <br /> Based on the method and assumptions described, the result of the nitrate loading balance <br /> indicates that the proposed development on the Site should not cause a build up of nitrates in <br /> the aquifer above 10 mg/L-N. <br /> 4.2 Methods of Mitigation <br /> Because of the favorable result of the nitrate loading calculation, no mitigation measures are <br /> warranted. <br /> 5.0 CONCLUSIONS AND RECOMMENDATIONS <br /> Our office concludes that the Site is suitable for development with the use of a standard septic <br /> system. All septic system construction should follow the San Joaquin County On-Site <br /> Wastewater Disposal Standards where applicable. <br /> Sincerely, <br /> Nei/O. Anderson&Associates, In <br /> �,\vktonme� <br /> pdL <br /> ` * REAi-08 <br /> Abigail co, Project Scientist t(1 <br /> Exp :: O <br /> REA I-08321 1, <br /> S�pNAL <br /> a DAVID I WELCH <br /> J. ;elc . M. ., Principal Geologist N0.2151 <br /> CEG-2151, CHG-653, GP-1049 * CERTIFIED <br /> ENGINEERING <br /> GEOLOGIST �Q <br /> Enclosure: Plate10 TgTFOFCAI <br /> CC: Peter Friis <br /> Friis Constructors, Inc. <br /> 18141 Foreman Court <br /> Linden, CA 95236 <br /> '.'04 <br /> 902 Industrial Way•Lodi,CA 95240.209.367.3701 •Fax 209.369.4228 ©2007 Neil O.Anderson&Associates,Inc. <br />