Laserfiche WebLink
RECEIVED <br /> NOV 15 2016 <br /> From: Nik Zagorov- ECO-CHEK Compliance, Inc. [mailto:nzagorov@eco-chek.com] <br /> Sent: Friday, November 11, 2016 8:40 AM ENVIRONMENTAL HEALTH <br /> To: EH-UST<ust@sicehd.com> DEPARTMENT <br /> Cc: Stacy Rivera [EH] <srivera@sicehd.com>; 'Ed' <diamondpetroleuml@vahoo.com> <br /> Subject: 550 West Valpico Road,Tracy-ARCO <br /> Stacy, <br /> After talking to you on the day of the test and Kasey Foley yesterday I hope I got everything right in order to complete the Annual <br /> Monitoring Certification and all future ones....The scope of work will by connecting manufacturer approved 10 foot long tubing to <br /> each bottom port of the Double wall Tank Top sumps-3 STP and 3 FILL. Each tubing will have on the other end a ball valve with <br /> Schrader valve connector.Tubing length will be enough to access it from the surface without entering in the sump.With bicycle <br /> pump air will be introduced and presence of air bubbles in the monitoring reservoir will confirm the Sump proper Communication. <br /> Attached please find tubing spec sheets and manufacturer statement of compatibility with the monitoring fluid requested yesterday <br /> by Kasey Foley. <br /> Also failed during the Annual Certification Tank 87 WEST Spill Bucket will be replaced "like for like".Attached please find all <br /> manufacturer certifications; ICC and CSLB A. <br /> Nik Zagorov <br /> President <br /> eco <br /> Eco-Chek Compliance <br /> ECO-CHEK Compliance, Inc. <br /> P.O. Box 1394 <br /> Lafayette, CA 94549 <br /> Phone: 888-500-CHEK <br /> Cell: 415-740-8590 <br /> Fax: 415-399-9602 <br /> www.eco-chek.com <br /> 3 <br />