My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
COMPLIANCE INFO_2015 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:04:34 PM
Creation date
11/25/2019 8:30:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015 - 2018
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVE) <br /> NOV 14 2016 <br /> 3 DIESEL No. GROSS TEST FAIL <br /> ALARM DISABLED ENVIRONMENTAL 'HEALTH 10.00% <br /> PERIODIC TEST FAIL <br /> ALARM DISABLED DEP <br /> ANNUAL TEST FAIL Request: bS5 161100 - Tank Leak TestType and Start Time <br /> ALARM DISABLED Request Source: Monitor System Configuration Requests <br /> Line: 65 <br /> 4 GROSS TEST FAIL <br /> ALARM DISABLED <br /> PERIODIC TEST FAIL <br /> ALARM DISABLED 161100 <br /> ANNUAL TEST FAIL OCT 26, 2016 2:32 PM <br /> ALARM DISABLED <br /> LEAK TEST METHOD <br /> TEST ON DATE : ALL TANK <br /> NOV 10, 2011 <br /> Request: 60 - 163100 - Tank Leak TestAveraging START TIME : 7:55 PM <br /> Request Source: Monitor System Configuration Requests - TEST RATE :0.20 GAL/HR <br /> Line: 60 DURATION : 2 HOURS <br /> TST EARLY STOP:DISABLED <br /> 163100 <br /> OCT 26, 2016 2:32 PM --------- -- - -- — <br /> Request: 66=- 161300 - CSLD Probability of Detection <br /> TANK LEAK TEST AVERAGING Request Source: Monitor System Configuration Requests - <br /> Line: 66 <br /> TANK PRODUCT LABEL ANNUAL PERIODIC <br /> 1 UNLEADED R OFF OFF <br /> 2 UL PREMIUM OFF OFF <br /> 3 DIESEL NO. OFF OFF 161300 <br /> 4 OFF OFF OCT 26, 2016 2:32 PM <br /> CSLD PROBABLITY OF DETECTION <br /> Request: 61 - 163000 - Tank=Leak Test notify <br /> Request Source: Monitor System Configuration Requests - --____ ---- ----- ---- <br /> Line: 61 Request:=67 - 161400 - CSLD Climate Factor <br /> Request Source: Monitor System Configuration Requests - <br /> Line: 67 <br /> 163000 <br /> OCT 26, 2016 2:32 PM <br /> 161400 <br /> IN-TANK LEAK TEST NOTIFY OCT 26, 2016 2:32 PM <br /> TANK PRODUCT LABEL TANK TEST NOTIFY: CSLD CLIMATE FACTOR <br /> 1 UNLEADED R OFF <br /> 2 UL PREMIUM OFF <br /> 3 DIESEL No. OFF =------------_____------- <br /> 4 OFF Request: 68 - 161600 - ACCUChart Update Scheduling <br /> Request Source: Monitor System Configuration Requests - <br /> Line: 68 <br /> Request: 62 - 163200 Tank=Test Siphon Break <br /> Request Source: Monitor System Configuration Requests - <br /> Line: 62 161600 <br /> OCT 26, 2016 2:32 PM <br /> TANK PRODUCT LABEL CAL UPDATE <br /> 163200 1 UNLEADED R IMMEDIATE <br /> OCT 26, 2016 2:32 PM 2 UL PREMIUM IMMEDIATE <br /> 3 DIESEL No. IMMEDIATE <br /> TANK TEST SIPHON BREAK 4 IMMEDIATE <br /> TANK PRODUCT LABEL SIPHON BREAK <br /> 1 UNLEADED R OFF ---- <br /> 2 UL PREMIUM OFF Request 69=- I61AOO - In-Tank Leak Test Early Stop <br /> 3 DIESEL No. OFF Request Source: Monitor System configuration Requests - <br /> 4 OFF Line: 69 <br /> Request 63 - 161000 - Tank delivery Delay I61AOO <br /> Request Source: Monitor System Configuration Requests - OCT 26, 2016 2:32 PM <br /> Line: 63 <br /> IN-TANK LEAK TEST EARLY STOP <br /> TANK PRODUCT LABEL TST EARLY STOP: <br /> 161000 1 UNLEADED R DISABLED <br /> OCT 26, 2016 2:32 PM 2 UL PREMIUM DISABLED <br /> 3 DIESEL No. DISABLED <br /> TANK DELIVERY DELAY 4 DISABLED <br /> TANK PRODUCT LABEL ---- <br /> 1 UNLEADED R 15 Request 70 - 261600 - In-Tank Static Gross Test Auto- <br /> 2 UL PREMIUM 3 Confirm <br /> 3 DIESEL NO. 3 Request Source: Monitor System Configuration Requests - <br /> 4 1 Line: 70 <br /> Request: 64 - I63AOO - Tank low Level Threshold for Line <br /> Manifold 161800 <br /> Request Source: Monitor System Configuration Requests - OCT 26, 2016 2:32 Pm <br /> Line: 64 <br /> IN-TANK LEAK GROSS TEST AUTO-CONFIRM <br /> 163AOO <br /> OCT 26, 2016 2:32 PM =_-_ _ - -------_ <br /> Request: 71=- 161COO - CSLD Report Only mode <br /> LOW LEVEL PUMP THRESHOLD FOR SEQUENTIAL LINE MANIFOLD Request Source: Monitor System Configuration Requests - <br /> Line: 71 <br /> TANK PRODUCT LABEL PUMP THRESHOLD <br /> 1 UNLEADED R 10.00% <br /> 2 UL PREMIUM 10.00% <br /> 3 DIESEL No. 10.00% 161cOO <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.