My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
COMPLIANCE INFO_2015 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:04:34 PM
Creation date
11/25/2019 8:30:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015 - 2018
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To: Page 5 of 10 2015-12-01 00:49:17(GMT) 14153999602 From: Nikola ZAGOROV <br /> REG VEU <br /> UST SYSTEM RETROFIT OR REPAIR NOV 3 0 2015 <br /> (Submit mininfurn of 3 sets of plans&applications:as originals will be retained by EHD) <br /> t•.. Site map enclosed? YES NO it ENVIRONMENTAL <br /> HPAITH ncoAaTRAGKIT <br /> 2. Submit copies of ILC Service Technician and/or Installer's certificate antl all manufacturer training certificates for each <br /> Person installing or testing any component that is repaired-or replaced. Ensure a copy of the"Site Health and Safety <br /> Plan"is available ion th a jobsite as required by Title 8- <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component,describe how.this will be done. (if <br /> addinq piping; UDC's,or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timety plan review): <br /> �, t�ti1c,Q i:1m K- t_A\C_ " - - -:For- e»QZ1R <br /> 4. List of equipment.to be.used(Attach manufacturer's specification sheets showing thin!-party approval): <br /> t+-c t- —_r) <br /> !& <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.