My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0000099 SSC RPT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SPARROW HAWK
>
13983
>
2600 - Land Use Program
>
MS-99-21
>
SU0000099 SSC RPT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 9:59:03 AM
Creation date
11/25/2019 9:42:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSC RPT
RECORD_ID
SU0000099
PE
2622
FACILITY_NAME
MS-99-21
STREET_NUMBER
13983
Direction
E
STREET_NAME
SPARROW HAWK
STREET_TYPE
RD
ENTERED_DATE
8/8/2001 12:00:00 AM
SITE_LOCATION
13983 E SPARROW HAWK RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k' ■ K L E I N F E L D E R <br /> LAURIE T. RACCA <br /> Area Environmental Manager/Client Service Manager <br /> underground fuel storage tanks. A risk based closure assessment is currently in <br /> progress. <br /> Placer County Service Station, Placer County Department of'Public Works•, Auburn, <br /> California. Conducted a soil and groundwater assessment as part of an underground <br /> storage tank removal and replacement program at the County vehicle service station. <br /> Leaking product piping associated with two underground fuel storage tanks impacted <br /> approximately 1,800 cubic yards of soil and weathered bedrock. The contaminated <br /> soil and rock were excavated and stockpiled pending evaluation of treatment and <br /> disposal options. Groundwater monitoring wells were installed to evaluate potential <br /> groundwater contamination. An application for site closure has been submitted to the <br /> appropriate regulatory agencies. <br /> American River Bridge Project, HDR Engineering, Folvom, California. Evaluated <br /> multiple potential hazardous materials sites within the right of way for the Folsom <br /> Boulevard realignment and approach for the new American River Bridge. The scope <br /> of work included a Phase 1 ESA, soil and groundwater assessments at four locations, <br /> asbestos surveys and abatement of 14 structures. evaluation of off-site contaminant <br /> sources, and negotiation of clean-up goals for 10.000 cubic yards of contaminated soil <br /> to be excavated during construction of the bridge. <br /> .Soil Sampling Investigation, Proposed School Site, Folsom, California. Evaluated the <br /> potential for mercury contamination due to former gold alining activities at a <br /> proposed school site located within the historic Folsom Mining District. Techniques <br /> used included aerial photograph review, geologic mapping, soil sampling and <br /> chemical analysis. <br /> Magpie Creek Diversion-Protect, Sacramento Area Flood Control Agency, Rio Linda, <br /> California. Historical research, stream sediment sampling and levee soil sampling <br /> were conducted within the Magpie Creek Diversion Project to evaluate potential <br /> contamination associated with surrounding land uses which included a mixture of <br /> urban with agricultural uses and the McClellan Air Force Base Superfund site. <br /> Rio Consumnes Correctional Canter, Sacramento County Department of Public <br /> Works, Sacramento County, California. Field geologist responsible for the <br /> installation of 29 groundwater extraction and/or sparge wells for a groundwater <br /> remediation system. <br /> Phase 1 Site Assessment, Mobil Chemical Plant, Woodland., California. Conducted a <br /> Phase I ESA of an operating plastics manufacturing plant prior to sale. Issues <br /> Racca, Laurie (4/99) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.