Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed: 333.00 <br /> Complete the following checklist: <br /> X Yes ❑ No* Is the audible alarm operational? <br /> X Yes ❑ No* Is the visual alarm operational? <br /> X Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> X Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> X N/A <br /> X Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br /> ❑ N/A detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) <br /> ❑ Sump/Trench Senscrs; ❑ Dispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor <br /> failure/disconnection? ❑Yes; ❑No. <br /> X Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e. no mechanical overfill prevention <br /> ❑ N/A valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly? If so,at what percent <br /> of tank capacity does the alarm trigger? % <br /> ❑ Yes* X No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* X No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)❑ Product; ❑Water. If <br /> yes,describe causes in Section E,below. <br /> X Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> X Yes I ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: EXTRA OTHER SENSORS IN THE SUMPS ON THE TANKS ARE VR-304. MOITOR THE INNERSTICAL <br /> FLUID IN THE SUMPS. <br /> 3 2/21/07 <br />