Laserfiche WebLink
SWRCB,January 2002 Page 5. <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING <br /> Test Method Developed By: F-1 UDC Manufacturer Industry Standard ❑X Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used: ❑ Pressure F-1 Vacuum x❑ Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used: VP Equipment Resolution: vplt to gph <br /> UDC# 1/2 UDC# 3/4 UDC# 5/6 UDC# 7/8 <br /> UDC Manufacturer: W.f . W.f. W.f. W.f. <br /> UDC Material: fiberglass fiberglass fiberglass fiberglass <br /> UDC Depth: 2511 2 5" 2511 2511 <br /> Height from UDC Top to Top of 611 611 611 611 <br /> Highest Piping Pentration: <br /> Height from UDCTop to Lowest 0 0 0 0 <br /> Electrical Pentration: <br /> Condition of UDC prior to testing: good good good good <br /> Portion of UDC Tested: 1 8,1 8" 8" 811 <br /> Does turbine shut down when <br /> sump sensor detects liquid(bothXlYes�No�N Yes❑No❑N FYes�No❑N Yes�No�1A <br /> product and water)?* <br /> Turbine shutdown response time: 2-5sec 2-5sec 2-5sec 2-5 s e c <br /> Is system programmed for fail-safe ❑ � ❑ [:] <br /> � 1:1 ❑ ❑ <br /> shutdown?* X Yes N N X Yes N N X Yes N N X Yes No A <br /> Was fail-safe verified to be ❑ ❑ � ❑ � � ❑ � ❑ <br /> operational?* X Yes N N X Yes N N X❑Yes N N X❑Yes[:]No[:]NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5min 5min 5min 5min <br /> test: <br /> Test Start Time: 10:3 8 9:59 11:58 11:5 8 <br /> Initial Reading(Rl): 4.124 10.336 3 .774 1. 063 <br /> Test End Time: 10:53 10:14 12 :13 12 :13 <br /> Final Reading(RF): 4.124 10.336 3.774 -3 .504 <br /> Test Duration: 15min 15min 15min 15min <br /> Change inReading(RF-Rl ): .000gph .000gph .000gph .5gph <br /> Pass/Fail Threshold or Criteria: .05gph .05gph .05gph .05gph <br /> Test Result: I:fl Pass El Fail Pass 1:1 Fail E Pass 0 Fail D Pass E Fail <br /> Was sensor removed for testing'? El, <br /> esL]No❑NAX Yes❑N NA X Yes No❑NA E Yes❑No❑NA <br /> Was sensor properly replaced and ❑ � � � � ❑ � � ❑ ❑ �E]N <br /> verified functional after testing? X Ye N NA %❑Ye N NA X Ye N NA X Yes N A <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />