Laserfiche WebLink
SAN JOAQ LINTY ENVIRONMENTAL HEALTH DJWRTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - PAGE 1 <br /> M01 <br /> TYPE OF ACTION [� 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Moe <br /> PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item only) ❑ THIS PLAN covERB ONLY 1THE <br /> FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) b Moa. <br /> FACILITY NAME l Mos. <br /> Moa. CITY �L G� <br /> FACILITY SITE ADDRESS 1 <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE M06. <br /> State law requires that tes ing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in <br /> accordance with the equipment manufacturers'instructions,or annually hichever is more frequent. Such work must be per <br /> by qualified personnel. Mol. <br /> MONITORING EQUIPMENT IS SERVICED L�f 1.ANNUALLY ❑ 99.OTHER(Specify): <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan ma ,etc.):%,Eich shows all required information,include it with this s plan. <br /> IV. TANK MONITORING Mlo. <br /> MO ITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) <br /> MENT VAULT(S) <br /> 1 CONTINUOUS E:_ECTRONIC MONITORING Of TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMI I <br /> SECONDARYCONTAINMENT IS: a DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM EL# <br /> M12.VM13 <br /> �/ MOD : �' � <br /> ♦\ba►c�.o M15. <br /> PANEL MANUFACTURER: -U-� Mla. MODEL#(S)- �•D�' <br /> -"LEAK SENSOR MANUFACTURER: <br /> M 17. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED 1'O MONITOR SINGLE WALL TA NK(S) MODEL#: <br /> PANEL MANUFACTURER: MlgM19. <br /> • MODEL#(S): <br /> IN-TANK PROBE MANUFACTURER: M2o. <br /> ❑ b.DAILYMIGHTLY ❑ c.WEEKLY <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS M21• <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M22. M23. <br /> .0.2 p.h. E] c.OTHER(Specify): M24. <br /> PROGRAMMED TESTS: El a.0.1 g.p.h. C1 b. g� b.STATISTICAL PER 23 CCR§2646.1 <br /> ❑ 3.INVENTORY RECONCILIATION F-1 a.MANUAL PER 23 CCR§2646 F-1 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 M25. <br /> TESTING PERIOD: ❑ <br /> a.36 HOURS ❑ b.60 HOURS <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 M26. M27. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY C] c.OTHER(Specify): <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ <br /> b.WEEKLY(Requires agency approval) M28. <br /> ❑ 99.OTHER(Specify): <br /> V. PIPE MONITORING Mao <br /> MONITORING IS PEF:FORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> /TRENCH ES AND OTHER SECONDARY CONTAINMENT W1 <br /> E I CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S) CH(ES) c.UNDER PRESSURE [Id.UNDER VACUUM_ FILLED ❑ M33. <br /> SECONDARY CONTAINMENT IS: LIJ'a•DRY ❑ b.LIQUID M32 MODEL#: <br /> ©� <br /> PANEL MANUFACTURER: ( � � � Gt' �J QST Mia. MODEL#(S): M35. <br /> /,• Q Q M36. <br /> LEAK SEN 30R MANUFACTURER: [z a.YES ❑ b.NO <br /> a.YES ❑ b.NO M37. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? <br /> WILL FAILURE/DISCONNECTION OMELD) TROT ROUTINELY RING SYSTEM PERFORMS 3.0 IGGER AUTOMg.p.h. LEAK TESTATIC PUMP SHUTDOWN?AND RESTRICTS OR SHUTS OFF <br /> C 2.MECHANICAL. LINE LEAK DETECTOR ( O M39. <br /> PRODUCT FLOW WHEN A LEAK ISpEATE�� Lh M38 MODEL#(S): d�V <br /> MLLD MANUFACTURER(s): ��JJ TESTS M41. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g•p•h•M41. MODEL#: <br /> M42. <br /> ELLD MANUFACTURER: b.MINIMUM ANNUAL 0.1 g•p•h. M43. <br /> a.MINIMUM MONTHLY 0.2 g.p.h. ❑ ❑ a.YES ❑ b.NO <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ Maa <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? <br /> M45. M46. <br /> ❑ 4.INTEGRITY TESTING b.EVERY 3 YEARS ❑ c.OTHER(Specify) <br /> a.ANNUALLY ❑ b WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED 5 M47 <br /> TEST FREQUENCY: ❑ • <br /> ❑ 5.V ISUAL MON fTORING DONE: ❑ a.DAILY "Req❑uires agency approval ""Allowed for monitoring of unburied emergency generaeliPB only per HSC§25281.5(6)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR <br /> UST(s) FROM MONITORING PER 23 CCR§2636(a)(3) Mos. <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TOT () <br /> ❑ 99.OTHER(Specify) 07/23/03 <br />