Laserfiche WebLink
Monikc:zing System Certification <br /> Site Address: M u,f °Lt( 1}�4 G _ Date of Testing/Servicing: 4� / I-If/L).y <br /> F. In-Tank Gauging/ SIR Equipment: C3-eheck this box if tank gauging is used only for inventory control. <br /> �I ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes I ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: I <br /> U-Ves ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: 01 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br /> ❑ YW LYNo* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ Nom* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> C N/A <br /> ❑ Yes ❑ o* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> /A or disconnected? <br /> ❑ Yes ❑ N * For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> 0 N/A malfunctions or fails a test? <br /> ❑ Yes ❑ o* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> Ll Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> H. Comments: �`1 P �� E/• �y "� t G3� 3� �� 1``P 4 �7�- i <br /> Page 3 of 3 05/00 <br />