My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
COMPLIANCE INFO_2000 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:51:24 PM
Creation date
11/26/2019 1:07:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2011
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IF � <br /> F. In-'1'nitk Gnugiitg /S114 hIIIiImI"'It: t7 1 'hr•rk diis box if lack Ranking is used only for inventory control. <br /> U Check this hnx ifno Tank gnuging or SIR equipment is installed. <br /> This section must he Ccnnhleled if in lank k milting c•(Impinvitf is used lf► perf"Min leak detection monitoring. <br /> Complete the following checklist: <br /> O Yes O No* Ilas all inpul wiring been insprctrd for Hooper volty nod tenninalion, including testing for ground fsults7 <br /> O Yes ❑ No* Were all tnok gauging lnoheq visually inspVclerl fill dan►nge and rc•gidne huilrlup? <br /> O Yes O No Was accuracy of system prodoct Irvel readings tested? <br /> O Yes O No* Was accuracy of system water level readings tested? <br /> O Yes O No* Were all probes reinstalled properly? <br /> O Yes ❑ No* Were all items on file ecp►ipmrnl manufnc otei's mniotenance checklist completed? <br /> " In the Section 11,below,describe how nr►d miro tht.cr drlicirnrirs were or will he corrected. <br /> C. Line I,enk Defectors (1.1,1)): U 1 'Irr•r k Ihi^. 1—x if I I IN ;nr r►nl inaLrllr rl <br /> Complete the following checklist: <br /> Yes O No" For equipment start-up rrr anno:►1 rrluipmeot crrtification, was n Ienk simulated to verify LLD performance? <br /> O N/A (Check all that npply) Sinnrlawd Irnk rale: fly g p.h.; U 0.1 g.p.h ; U 0.2 g.p.h. <br /> c2r Yes O No" Were all LLDs confirmed ope►atinnal nod nccurate within regulnlory requirements'! <br /> Yes ❑ No" Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDq, doeq the 1.1.1) restrict product flow if it detects a leak'! <br /> ❑ N/A - - - - <br /> O Yes ❑ No* For electronic LLUs, doeq thr 11 1 le. automatically shut off if the 1.I.1)detects a leak? <br /> O Yes ❑ No* For electronic LLI)s, docs file hnhine 1111o►nalically start off if any portion of the monitoring system is disabled <br /> G—RiA or disconnected? <br /> O Yea O No* For electronic Ll,l)s, dors tilt. tu►l►ine aotnlnnfc.illy shut off if any portion of the monitoring system <br /> U N/A malfunctions or fails a trgt? <br /> O Yes ❑ No* For electronic LI.Ds, I►ave all m-f-eg6file wiring cooneclions been vismnlly inspected? <br /> Yes ❑ No* Were all ilenrq on file r(joilmlcnt num►uli►ctmer's n►nintennnce checklist cont leteW <br /> •In the Section 11, below, describe how and when these drlirien•ies were or will he corrected. <br /> H. Comments: - <br /> 1'nI!r 1 of I 63101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.