Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> [1 Other(Specify) <br /> Test Method Used: X Pressure 0 Vacuum I]Hydrostatic <br /> 'i Other(Spec) <br /> Test Equipment Used:Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: Smith Smith <br /> Piping Manufacturer: Fiberglass Fiberglass <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: Approx. 170' Approx. 170' <br /> Product Stored: Regular 87 Super 91 <br /> Method and location of Test boot at STP#1 Test boot at STP#2 <br /> piping-run isolation: <br /> Wait time between applying 15 Minutes 15 Minutes <br /> pressure and starting test: <br /> Test Start Time: 8:25 8:35 <br /> Initial Reading(Rj): 3.2 Psi 3.2 Psi <br /> Test End Time: 9:25 9:35 <br /> Final Reading(RF): 3.2 Psi 3.2 Psi <br /> Test Duration: 1 Hour 1 Hour <br /> Change in Reading(RF-Rj): 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: X Pass ❑Fail X Pass Fail Pass ❑Fail Pass Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />