My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012663
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6800
>
2600 - Land Use Program
>
PA-1700051
>
SU0012663
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2020 1:29:40 PM
Creation date
11/26/2019 4:51:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012663
PE
2631
FACILITY_NAME
PA-1700051
STREET_NUMBER
6800
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231-
APN
19307013
ENTERED_DATE
11/26/2019 12:00:00 AM
SITE_LOCATION
6800 S EL DORADO ST
RECEIVED_DATE
11/26/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PA-1700051 (SA) Project - 3 - 10 May 2017 <br /> San Joaquin County <br /> (SWPPP). <br /> For more information on the Construction General Permit, visit the State Water Resources <br /> Control Board website at: <br /> http:llwww.waterboards.ca.gov/water_issues/programs/stormwater/constperm its.shtmi. <br /> Phase I and 11 Municipal Separate Storm Sewer System (MS4) Permits' <br /> The Phase I and II MS4 permits require the Permittees reduce pollutants and runoff flows <br /> from new development and redevelopment using Best Management Practices (BMPs) to <br /> the maximum extent practicable (MEP). MS4 Permittees have their own development <br /> standards, also known as Low Impact Development (LID)/post-construction standards that <br /> include a hydromodification component. The MS4 permits also require specific design <br /> concepts for LID/post-construction BMPs in the early stages of a project during the <br /> entitlement and CEQA process and the development plan review process. <br /> For more information on which Phase 1 MS4 Permit this project applies to, visit the Central <br /> Valley Water Board website at: <br /> http:/Iwww.waterboards.ca.gvv/centralval{ey/water issues/storm water/municipal_permits/. <br /> For more information on the Caltrans Phase I MS4 Permit, visit the State Water Resources <br /> Control Board at: <br /> http://www.waterboards.ca.gov/water issues/programs/stormwater/caltrans.shtm I. <br /> For more information on the Phase 11 MS4 permit and who it applies to, visit the State <br /> Water Resources Control Board at: <br /> http://www.waterboards.ca.gov/water_issues/programs/stormwater/phase_ii_municipal.sht <br /> ml <br /> Industrial Storm Water General Permit <br /> Storm water discharges associated with industrial sites must comply with the regulations <br /> contained in the Industrial Storm Water General Permit Order No. 2014-0057-DWQ. <br /> For more information on the Industrial Storm Water General Permit, visit the Central Valley <br /> Water Board website at: <br /> http://www.waterboards.ca.gov/centralvalley/water issues/storm_water/industrial_general_ <br /> perm its/index.shtm l. <br /> Clean Water Act Section 404 Permit <br /> If the project will involve the discharge of dredged or fill material in navigable waters or <br /> wetlands, a permit pursuant to Section 404 of the Clean Water Act may be needed from the <br /> Municipal Permits=The Phase I Municipal Separate Storm Water System(MS4)Permit covers medium sized <br /> Municipalities(serving between 100,000 and 250,000 people)and large sized municipalities(serving over <br /> 250,000 people). The Phase II MS4 provides coverage for small municipalities, including non-traditional Small <br /> MS4s,which include military bases, public campuses,prisons and hospitals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.