Laserfiche WebLink
• <br /> C � <br /> AMgRIA <br /> Report Prepar¢hon:Following the completion <br /> of the DPE/SV <br /> E activities,Port which will describe th field activities, tabulate the field data,Cambria <br /> ybMata the mass <br /> of contaminants removed through DP SVE, P ,pare <br /> and summarize the results and findings. <br /> CLOSING <br /> The scope of work described in this <br /> supervision of a California registered work plan addendum will be performed under the <br /> scheduled u on approval g eologist or professional engineer. This work will be <br /> © P from the SJC FID. If you have an <br /> work outlined in this work plan addenda y questions regarding the scope of <br /> m please call Aubrey Cool at(510)420-3336. <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> Aubrey . Cool <br /> Project Geologist <br /> tcQH W ti OC <br /> Joe W. Neely,RG <br /> Senior Project Geologist <br /> RG 6927 No.6927 <br /> 9 �P <br /> Attachments OF <br /> Figure <br /> Figure 1. Site Vicinity/Well Survey Map <br /> Figure 2. Site Plan <br /> cc: Ms. Karen Petryna,Shell <br /> Mr. James Barton,Central Valley Regional Water Quality Control Board <br /> 4 <br /> ��SQ <br />