My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6131
>
3500 - Local Oversight Program
>
PR0545003
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 11:04:58 AM
Creation date
11/27/2019 10:58:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545003
PE
3526
FACILITY_ID
FA0002324
FACILITY_NAME
Pacific Service Station
STREET_NUMBER
6131
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09746418
CURRENT_STATUS
02
SITE_LOCATION
6131 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> APR 13 1992 <br /> ENVIRONMENTAL HEALTH <br /> AEGIS ENVIRONMENTAPRMITASNMES <br /> 1050 Melody Lane, Suite 160, Roseville, CA 95678 + 916 •782-2110/916.969-2110/FAX 916.786-7830 <br /> April 2, 1992 <br /> Mr. Steve Schneider <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> 445 North San Joaquin Street <br /> Stockton, California 95202 <br /> Subject: Shell Service Station <br /> 6131 Pacific Avenue, Stockton, California <br /> Dear Mr. Schneider: <br /> This letter memorializes our telephone conversations of February 19 and March 26, 1992, <br /> regarding the subject site. Monitoring and sampling was not performed at the end of the <br /> 3-month interval ending in January 1992 due to a vapor extraction pilot test then in <br /> progress at the site. Monitoring and sampling was performed following termination of the <br /> pilot test in mid-February. <br /> Aegis intends to continue monitoring and sampling at the site, at 3-month intervals, <br /> starting with the February 1992 sampling event. <br /> If you have any questions, please call me at (916) 782-2110. <br /> Sincerely, <br /> 404 x P J'�e� <br /> David L. Poulsen <br /> Staff Geologist <br /> DLP/law <br /> cc: D. Kirk, Shell Oil Company <br /> 90-020R.LTR <br /> GEOLOGISTS • ENGINEERS • GROUNDWATER SCIENTISTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.