Laserfiche WebLink
1 <br /> page 2,6131 Pacific Ave. <br /> Please proceed with submittal of a detailed work plan for installation of the <br /> complete remediation system. Include in the work plan the following: <br /> 1. Installation details of the proposed four additional extraction wells <br /> 2. Specific design details and diagrams for the proposed remediation <br /> system. <br /> 3. Plans for the disposal of the extracted groundwater. If it will be discharged <br /> on site, copies of the appropriate permits would be required. <br /> 4. A calculation of contaminant mass remaining in both soil and groundwater <br /> beneath the site. <br /> The work plan is due for submittal no later than November 21, 2005. If you have <br /> any questions please call Lori Duncan at (209) 468-0337. <br /> Donna Heran, REHS, Director <br /> Environmental Health Department <br /> Lori Duncan, Senior REHS Nuel C. Henderson, Jr., PG <br /> LOP/Site Mitigation Unit IV LOP/Site Mitigation Unit IV <br /> cc: James Barton, CVRWQCB <br /> Aubrey Cool, Cambria <br />