Laserfiche WebLink
CAMBRIA <br /> concentration of 2,800 ppb, however, analysis by EPA Method 8260A did not <br /> confirm this MTBE concentration <br /> Quarterly Sampling <br /> Groundwater samples were analyzed for total purgeable hydrocarbons as gasoline (TPHg) <br /> according to EPA Method 8015 (Modified) and benzene, toluene, ethylbenzene, xylenes <br /> (BTEX), and methyl tertiary butyl ether (MTBE) according to EPA Method 8020 <br /> Groundwater samples collected from well MW-7 were also analyzed for MTBE according to <br /> EPA Method 8260A <br /> Field monitoring data and chemical analytical data are presented in a summary table to <br /> Blaine's groundwater monitoring report (Appendix A) <br /> MTBE Detection Limit <br /> In our January 31, 2000 Response Letter/Work Plan, we indicated we would be able to meet <br /> • your request for lower MTBE detection limits We discussed the lower detection limits with <br /> Sequoia Analytical Labs (Sequoia) and they indicated they could meet the 0 5 to 1 0 ppb <br /> detection limits with EPA Method 8020 We were told later by Sequoia that this was a <br /> mistake, they could not get these low detection limits by EPA Method 8020 Therefore we <br /> will not be able to achieve these lower detection limits as we previously indicated unless we <br /> use the more expensive EPA Method 8260 At this point we do not recommend performing <br /> the EPA Method 8260 analysis on all of the monitoring wells at this site <br /> Conclusions <br /> Groundwater samples collected from the wells this quarter contained concentrations of <br /> petroleum hydrocarbons and MTBE consistent with historical ranges for this site <br /> Closing <br /> Cambria submitted a work plan to SJCPHS on January 31, 1999 for further investigation at <br /> this site SJCPHS approved this work plan and we are pursuing access agreements and <br /> encroachment permits for the proposed off site monitoring wells The two proposed onsite <br /> soil borings are tentatively scheduled to be drilled May 23 and 24, 2000 <br /> • Quarterly monitoring and sampling will continue on the established schedule for this site <br /> 0854 2 <br />