My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006825
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6131
>
3500 - Local Oversight Program
>
PR0545003
>
ARCHIVED REPORTS_XR0006825
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 11:34:27 AM
Creation date
11/27/2019 11:12:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006825
RECORD_ID
PR0545003
PE
3526
FACILITY_ID
FA0002324
FACILITY_NAME
Pacific Service Station
STREET_NUMBER
6131
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09746418
CURRENT_STATUS
02
SITE_LOCATION
6131 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAMBRIA <br /> event These results will be submitted under separate cover Analyses for 1,2-dichloroethane <br /> (1,2-DCA) and ethylene dibromide (EDB) were also added to the sampling protocol All wells <br /> will be analyzed quarterly for TPHg, BTEX, MTBE, 1,2-DCA and EDS The wells will be <br /> analyzed annually (in the third quarter)for fuel oxygenates <br /> Wellhead Survey Achvitaes Following monrtonng well installation, a licensed surveyor will <br /> survey wellhead elevations relative to mean sea level and the latitude and longitude of each well <br /> location <br /> Interim Remediation. Cambria recommends implementing interim remediation in the vicinity of <br /> the former UST pit Cambria recommends conducting a dual-phase extraction (DPE) test This <br /> involves simultaneously extracting groundwater and soil vapors Groundwater extraction is <br /> implemented to dewater the formation to a target elevation, while soil vapor extraction removes <br /> hydrocarbon-bearing vapors from that zone Cambria will conduct a short-term (24-hour) DPE <br /> test, using existing SVE well VEW-2 If warranted by the 24-hour test data, Cambria will extend <br /> the testing period up to five days to collect additional data and maximize mass removal Cambria <br /> may also concurrently conduct an SVE test using existing SVE well VEW-1, which is currently <br /> screened above the water table <br /> Report Preparation Following the receipt of analytical results from the laboratory, Cambria will <br /> prepare a written report which will include field procedures, laboratory results, boring logs, and <br /> conclusions <br /> The scope of work described in this work plan will be performed under the supervision of a <br /> registered geologist <br /> CHROMATOGRAM SUBMITTAL <br /> As requested, Cambria is submitting the chromatograms from the first quarter 2003 sampling <br /> event for all wells (Appendix B) for your review Shell is very interested in your evaluation of <br /> the attached chromatograms <br /> SCHEDULE <br /> Cambria is prepared to implement the well installations upon written approval of this work plan <br /> by SJCEFfD and receipt of an appropriate drilling permit and access agreement Cambrid is <br /> • prepared to implement the DPE test upon written approval of this work plan by SJCEHD <br /> 0854 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.