My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
COMPLIANCE INFO_1998 - 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:36:34 PM
Creation date
11/27/2019 1:15:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 1999
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Be sure to check with your LIA <br /> What You Need to Know �orejou startupgrading. <br /> ClffaAitit�•7G]!�'YNlSIWR17.Yfl1SWISpIY�a <br /> What is Automatic Pump Shutoff? <br /> What Is Upgrading? B December 22, 1998, all single-walled pressurized <br /> Upgrading means bringing an underground storage tank Do I Have to Unmade My UST? y g <br /> g g 8 g piping must be able to shut off automatically. That is, <br /> (l1S"1')system, including piping,up to current regulatory If you want to keep using your UST, you can either - <br /> (UST <br /> standards. Depending on how your system is equipped, upgrade it or replace it with a new one that meets the piping must be monitored by an automatic line <br /> California requirements. Whether you upgrade or replace leak detector that will shut off the pump so that <br /> it may mean installing any one or a combination of the -you're going to need a licensed contractor. dispensing cannot occur in the event of a leak or <br /> following system failure. <br /> • interior lining Whal If I Don't Want the Tank Anymore? <br /> • cathodic protection Get permission from your LIA to close it (have it What is Cathodic Protection? <br /> spill container removed). Be sure to get a licensed contractor and follow It means protecting a tank system against corrosion. <br /> 0 overfill prevention equipment closure requirements in Article 7 of California's UST Corrosion happens when bare 'metal and soil and <br /> sinker plates regulations. moisture combine to produce tin electric current that <br /> • secondary containment for the tank and piping destroys hard metal. Over time, corrosion creates <br /> • automatic pump shutoff Why Should I URgirride Early? holes in'tanks and'then leaks occur. To protect against <br /> Which Tanks Need to Be Ungraded? <br /> Because if you wait: corrosion,you may do one of the following: <br /> • Single-walled steel tanks • Install cathodic protection for the tank and piping. <br /> • AN tanks that don't have spill and overfill prevention • Licensed contractors may be booked. Methods include an impressed current system or <br /> and striker plates • Supplies needed for upgrading may be scarce. a sacrificial anode system,'and add interior lining <br /> • All single-walled waste oil tanks • Your LIA may be inundated with requests for to the tank. <br /> • Any tank not in compliance with California regula- upgrading or removal permits, making your request OR <br /> tions take longer. Replace with a double-walled tank and piping that <br /> • Your insurance company may not honor your policy if are already protected against corrosion. <br /> Which Pining Needs to Be Ungraded? your tanks are not in compliance by the deadline. <br /> • Any piping that does not have corrosion protection • Availability of State low cost loans for upgrading or <br /> • replacing tanks may decrease as the deadline nears. Once I Upgrade With interior Luting and <br /> Single-walled piping other than motor vehicle fuel p g Y Cathodic Protection,Then What? <br /> piping needs to be upgraded (replaced) with sec- Cathodic protection systems must be inspected <br /> ondary containment. What is a Spill Container? within 6 months of installation and every 3 years <br /> A container installed around the fill pipe to contain spills thereafter. Impressed current systems must also <br /> .mien Is the Deadline? during deliveries to the tank. be checked every 60 days. <br /> December 22, 1998. That's not the deadline for begin- Cathodic protection systems must be checked <br /> ning the job-that's when it has to be finished. if it's not What is Overfill Prevention Eauiymenti within 6 months of any repair or tnodificatioii to a <br /> finished,the tank goes out of service and the owner could Overfills happen when someone tries to put more product UST facility in which the modification may have <br /> face fines or criminal charges. The deadline will not be into a tank than it will hold. There are three main types of affected the cathodic protection system. <br /> extended by either the federal or state government. overfill protection: automatic shutoff devices, ball float . Interior lining must be inspected in 10 years and <br /> valves, and overfill alarms. every 5 years thereafter. <br /> Who Do I have to Notify About Upgrading? <br /> You must notify your local implementing agency (LIA) How Can I Get Vinanclal help to Upgrade <br /> ore <br /> be you upgrade your US"r system. In California, If you don't get started now... MY Tank? <br /> LIAs may be either city or county offices. It is the same The California Trade and Commerce Agency,Office <br /> agency that issued your UST operating permit. If you're you may not be able to find a of Small Business,offers low interest loaris to small <br /> unsure where your agency is, call your County Depart- businesses with USTs. Call the Office of Small <br /> ment of Health or City Fire Department. contractor Business in Sacramento at(916)323-9879 for <br /> Primed on recyclut paper uteri information on the"Repair/Replace Underground <br /> Storage Tank Loan Program'(RUST). <br />
The URL can be used to link to this page
Your browser does not support the video tag.