My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986 - 1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
COMPLIANCE INFO_1986 - 1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:43:50 PM
Creation date
11/27/2019 1:44:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 1997
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� r <br /> 1 <br /> WR=NI MONTTOR NG PROCEDURES <br /> UNDERGROUND STORAGE TANLK MONITORING PROGRAM//j p� <br /> iris monitoring vrogram must be Sept at the UST Iocation at all rimes. the iafor nation on chis monitoIia; ' l; <br /> program are conditions of the opetmang permit The permit holder mus: aorify San Joaquin County �3 <br /> Eavironmenmi Health Division, phone (^_09) 463-3120 within 30 daps of any cb=ges cc the monitoring <br /> procedures, unless required cc obtain approval before making the change. <br /> Required by Sons 2632(d) and 2641(h) CCR <br /> Faclity Name <br /> Facility Address l�l 6,.` . G' c t t >z I'ueu P 1 C_it?n 1✓ c// <br /> 1 <br /> A. Desa ioe the frequency of perfor:=igg the mcnitorirz : <br /> Tan <br /> Piping > <br /> i <br /> B. What methods and equipment identined by name and mcde:, will be used for <br /> perfor=7 the monitoring- <br /> Tank <br /> onitoring1ank <br /> piping <br /> J <br /> C. Des..:.oe the Iecation(s) waere the monitoring will be pe crmed (fae ity plot pian <br /> should be atrached): <br /> D. List the sarne(s) and dde(s) of the =pie respons:cie for pe:fcrming the monizorng <br /> and/or mamtaininthe equipment <br /> E. Reporting fcrnat for monitoring: _ <br /> Tank <br /> Piping <br /> F. Descri-be the pre-renrive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' mnintenan _ schedule <br /> but not Less than eves Lmonths: ' <br /> G. 17esc7:ce the training necessary tar the operation of UST T''rstem. InC.LCL'tg Cicina <br /> and the monitoring equipment: <br />
The URL can be used to link to this page
Your browser does not support the video tag.